1) Shuibuya Hydropower Plant
水布垭电厂
1.
Auto-switch-over pattern of 10 kV reserve electric source of Shuibuya Hydropower Plant;
水布垭电厂10kV厂用电系统备自投方式
2) shuibuya hydropower station
水布垭电站
1.
The synchronizing point plan for shuibuya hydropower station to paralle in power system has been analysed comperhendively on technical and economic aspect,and the importance and rationalization of the synchronizing point plan was expounded.
对水布垭电站接入系统主要落点方案进行了较为深入的技术、经济综合分析,阐述了落点方案优化的重要性和合理性。
2.
A new 500 kV switch station will be build near shuibuya hydropower station after the cutover design of shuibuya hydropower have been censored .
水布垭电站接入系统设计(一次部分)通过审查后,在电站附近将新建500kV开关站。
3.
The successful experiences and inadequacies in implementation of resettlement work of Shuibuya Hydropower Station are summarized;the thinking and suggestions on strengthening the management of resettlement work are proposed.
总结了水布垭电站移民工作实施中的成功经验与不足之处,提出了加强移民工作管理的思考和建议。
3) Shuibuya Project's underground powerhouse
水布垭地下厂房
4) Shuibuya Hydropower Station
水布垭水电站
1.
Technology for installing base-ring and stay-ring of hydroturbine of Shuibuya Hydropower Station;
水布垭水电站水轮机基础环及座环安装
2.
On cracking treatment technique for facing concrete of concrete faced rockfill dam of Shuibuya Hydropower Station;
水布垭水电站混凝土面板堆石坝面板混凝土裂缝处理技术综述
3.
Key Points and Methods of Supervision Quality Control on Anti-scouring Wall Construction of Shuibuya Hydropower Station;
水布垭水电站防淘墙施工监理质量控制及方法
5) Shuibuya Hydropower Project
水布垭水电站
1.
Design and Construction Methods of the Anti-scouring Wall for Shuibuya Hydropower Project;
水布垭水电站防淘墙设计与施工
2.
Downstream anti-scouring wall design for flood spillway of Shuibuya hydropower project;
水布垭水电站溢洪道下游消能防冲防淘墙设计
3.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
6) Shuibuya
水布垭
1.
Analysis on Safety Monitoring of the Shuibuya Concrete Face Rockfill Dam;
水布垭面板堆石坝安全监测分析
2.
Anti-crack design for concrete slab of Shuibuya rock-fill dam;
水布垭堆石坝混凝土面板抗裂设计与工程实践
3.
3-D Stability Analysis on Emptying Tunnel of Shuibuya Project on Qingjiang River;
清江水布垭水利枢纽放空洞三维稳定性分析
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条