您的位置:首页 -> 词典 -> 大跨度交岔点
1)  large-span crossing points
大跨度交岔点
1.
Taking the intersection of Mining Area 7 in Baodian Mine for example,the paper discusses supporting methods and construction technology of soft rock roadway in large-span crossing points,making use of support of anchored net and sprayed concrete technology and anchor reinforcement role in the design of support parameters made good economic and effects.
以鲍店煤矿七采区交岔点为例,探讨了大跨度交岔点软岩巷道的支护方法和施工工艺,利用锚网喷支护技术加锚索补强作用设计支护参数,取得了良好的经济效益和实施效果。
2)  large span intersection
大跨度交叉点
3)  intersections [英][,intə'sekʃən]  [美][,ɪntɚ'sɛkʃən]
交岔点
1.
The authors finally put forward some reasonable measures in temporarily shoring on intersections.
应用数值计算技术对张集煤矿8煤层大断面交岔点巷道支护进行计算分析,获得该交岔点的支护参数为顶板每排6根锚杆、直径22 mm、排距0。
2.
The results show that deformation and failure in areas of all styles of roadway intersections are more serious than those of roadways without any intersection,with the deformation at the cross style of roadway intersection being the most serious.
为了揭示巷道交岔点失稳机理,寻求合理的交岔点支护方式,采用FLAC3D程序对不同交岔点形式、深度、围岩强度、开挖顺序及开挖步距大小等因素进行了数值模拟计算。
4)  intersection [英][,ɪntə'sekʃn]  [美]['ɪntɚ'sɛkʃən]
交岔点
1.
Application and Research on Support of Bolt,Net and Spraying in Intersection of Soft Surround Rock;
软围岩交岔点锚网喷支护的应用及研究
2.
The application of special support at the intersection of coal mine passages;
特种支架在煤巷交岔点中的使用
3.
Aimed at the feature of large intersection and working hard trouble in Zhangji Coal Mine 1110(3) fully-mechanized coal winning,we adopt bolt and anchor cable technology and combined the feature of roof rock fixed the rock around the intersection.
针对张集煤矿1110(3)综采面轨运联巷交岔点断面大,综掘机施工困难的特点,采用锚杆锚索支护技术,并结合顶板岩性局部变化的特性,有效地对交岔点及周边围岩进行了加固。
5)  crossing [英]['krɔsɪŋ]  [美]['krɔsɪŋ]
交岔点
1.
Instability analysis of large-bore crossing and its control;
大断面交岔点失稳分析及治理
2.
Grouting reinforced technology for crossing of No.910 east roadway in Malan Mine;
马兰矿910东大巷交岔点注浆加固技术
3.
The paper has made a analysis of destruction at arching crossing,raised the corresponding manitenance method——reinforcing by adjoining rock grouting at crossing.
本文通过对砌碹交岔点破坏原因的分析,提出较适应砌碹交岔点维修的方法,即对交岔点采取围岩注浆加固,用“内补外固”法修复。
6)  roadway intersection
交岔点
1.
In order to find reasonable reinforcement parameters for roadway intersection,based on orthogonal de- sign test,a simulation analysis was taken on reinforcement parameters for roadway intersection under different rock mass strength by FLAC~(3D),and the outcome data of the test were analyzed by range analysis and variance analysis.
为了寻求交岔点巷道合理的支护参数,基于正交设计试验,采用数值模拟软件Flac~(3D)对不同围岩强度下交岔点巷道的支护参数进行了数值模拟分析,并对试验结果进行了极差和方差分析。
2.
Aim at the problem of complex in stress distribution and hard to support at roadway intersection caused by broken surrounding rocks,we simulated the stress distribution at roadway intersection before and after being reinforced by using the software FLAC3D.
为了解决巷道交岔点处的围岩松散破碎引起的应力分布复杂难以支护的问题,本文采用FLAC3D数值模拟软件对巷道交岔点处加固补强前后的应力分布状态进行了模拟。