1) allowable deformation of soft rock
软岩变形合理值
2) soft rock deformation
软岩变形
1.
This paper educes the conclusion that soft rock deformation rate influence greatly the construction of the depth Tunnel TBM, having adopted corresponding treating measure is effective and reasonable, by the accident analysis and lest which of the TBM was hoped and the relevant section tube piece brought cracks in the construction by TBM of 7 # Tunnel of the connection Works, YRDP.
通过对山西省引黄工程联接段7#隧洞TBM施工中掘进机被箍及相应区段部分衬砌片出现裂缝的事故分析及测试,得出软岩变形速率对深埋隧道TBM施工影响很大的结论,相应采取的处理措施证明是有效合理的。
5) large-deformation tunnel in soft rock
软岩大变形隧道
1.
The secondary lining construction time of large-deformation tunnel in soft rock is a controversial issue in tunnelling engineering.
软岩大变形隧道二次衬砌施作时机始终是隧道界讨论的热点问题,但目前还没有具体的软岩大变形隧道二次衬砌施作时机的判别指标。
补充资料:大坝内部变形观测(见水工建筑物变形观测)
大坝内部变形观测(见水工建筑物变形观测)
daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条