1) sloping coal seam laying
倾斜煤层铺设
2) inclined seam
倾斜煤层
1.
Application of DY-150 type single-drum shearer at inclined seam;
DY—150型单滚筒采煤机在倾斜煤层中的使用
2.
The production forecasting model about multi-branch wells in inclined seam in different tendencies;
倾斜煤层中不同倾向多分支井产能预测模型
3.
This paper introduces that tilting prevention support group is developed and applied result in inclined seam workface.
介绍专为倾斜煤层采煤工作面研制的单体防倒组合支架及其应用效果。
3) inclined coal seam
倾斜煤层
1.
Strata behavior and its control of inclined coal seam face;
倾斜煤层长壁开采岩层运动特征及顶板控制
2.
In order to recognize the characteristic and regularity of underground coal gasification(UCG) in inclined coal seams, the model test was conducted with the help of a multi function model test platform.
为了认识倾斜煤层煤炭地下气化特征和规律性 ,藉助多功能模型试验台 ,对倾斜煤层进行了模型试验研究 。
3.
A typical gateway in inclined coal seam is analyzed using fully-deformablediscrete element method.
采用可充分变形的离散无法,对一个倾斜煤层回采巷道的稳定性进行了分析,并进行了围岩松动范围的测试。
5) steep seam
急倾斜煤层
1.
Repetitive mining subsidence with thick soil layers and steep seam;
厚冲积层急倾斜煤层群开采重复采动下的开采沉陷
2.
Similar material simulation study on the mining overburden movement law in steep seam;
急倾斜煤层开采上覆岩层运动规律模拟研究
3.
Model and its application on the evaluation of degree of difficulty of top coal caving in steep seam;
急倾斜煤层顶煤可放性评价模型及应用
6) steeply inclined coal seam
急倾斜煤层
1.
Based on the analysis of problems in slope mining in steeply inclined coal seam in Datai Mine, 3 improvement projects were put forward according to on-the-spot application status.
分析了大台矿急倾斜煤层斜坡式开采存在的问题,结合现场应用情况,提出3种改进方案,条件适宜时,配合机械化水平的提高,可提高生产效率和经济效益。
2.
Aimed at the steeply inclined coal seam of Datai Mine,practicable prevention measures are put forward and better effective is obtained.
结合大台井急倾斜煤层提出了相应的切合实际的防治措施,如防治冲击矿压的钻孔布置、注水设备的选择、注水工艺参数的确定等,收到了较好的实效。
3.
Based on the #403 face entry of Guandi coal mine,the characters of steeply inclined coal seam entry maintenance is introduced.
以官地矿403工作面回采巷道为工程背景,介绍了急倾斜煤层巷道的维护特点,分析了该巷道的支护难题。
补充资料:《铺设海底电缆管道管理规定》
《铺设海底电缆管道管理规定》
regulations on management of laying submarine cables and pipelines
Pushe haidi dianlan guandao guanli guiding《铺设海底电缆管道管理规定》(regulationson~a-gelllent ofl娜飞submanne eables and pi州ines)l卿年2月11日国务院颁布,自1989年3月1日起施行。其宗旨在于维护中华人民共和国主权和海洋权益,有序地铺设和保护海底电缆、管道,合理地开发利用海洋空间。中国海洋行政主管部门是铺设海底电缆、管道及为此所进行的“路由”调查、勘测与有关活动的主管机关。该规定在实际管理中,需根据不同管理对象和不同情况区别对待。对于中国的企业、事业单位铺设海底电缆、管道的活动,主管机关主要对其所要铺设的“路由”实施审批,以实现科学、有序的铺设和正常使用与保护;对于外国的公司、企业和其他经济组织或个人在中国的内海、领海范围内铺设海底电缆、管道以及为铺设所进行的“路由”调查、勘探活动,则必须按规定事先向主管机关提出书面申请,获准后方可实施。外国作业者在中国大陆架上进行上述活动,除应事先通知主管机关外,其最后确定的“路由”须经主管机关同意。此外,该规定对海底电缆、管道的保护、维修、改造、拆除和废弃也作了相应的规定,并将收集海底地形、海上构筑物分布等方面的资料以及提供咨询服务作为主管机关的义务加以规定。 (赵恩波)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条