2) high voltage distribution network of mine
矿井高压配电网
4) high temperature mine
高温矿井
1.
Temperature checking method to set up maxium allowed production of coal mining face in high temperature mine;
温度校核法确定高温矿井工作面最大允许产量
2.
Being effected by air flow temperature,the use rule algorithm calculation high temperature mine tunnel ventilation parameter is able to come into being the specified error.
受风流增温的影响,使用常规算法计算高温矿井的巷道通风参数会产生一定误差,这会直接影响风网解算结果。
3.
The present state of the high temperature mine and its harms are summarized in this paper.
该文概述了我国高温矿井现状。
5) More Outbursting Coal Mine
高突矿井
6) high-yield and high-benefit pit
双高矿井
1.
This paper introduces the general situation of high-yield and high-benefit pit of Fenghuangshan Mine the experiences of which are relaying on sci-tech progress, upholding the combination of reform and tapping potential, laying equal stress on management and technology, and strengthening the field management through personnel reduction and diversion.
介绍了凤凰山矿依靠科技进步,坚持改革与挖潜结合,管理与技术并重,并通过减员分流,加强现场管理,使得双高矿井建设工作得到稳步发展的概况。
补充资料:高压线走廊(高压架空线路走廊)
在计算导线最大风偏和安全距离情况下,35kV及以上高压架空电力线路两边导线向外侧延伸一定距离所形成的两条平行线之间的专用通道。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条