1) blast furnace transformation
高炉改造
1.
It not only meets the requirements of blast furnace transformation to bearing capacity of foundation and its deformation,but also integrity of foundation is r.
这样不仅满足了高炉改造对地基承载力及其变形的要求,而且基础整体性增强,刚度加大,满足了高炉增载对基础稳定性的要求。
2) Reconstruct of High Temperature Resistance Furnace
高温电阻炉的改造
3) furnace liner revamping
炉衬改造
4) Transforming boilder
改造锅炉
5) remaking of EAF
电炉改造
6) boiler rebuilding
锅炉改造
1.
This paper introduces a new clean burning way,namely gasfield coal burning,analyzes principle of gasified coal,the coal conformed to gasyification,the condition and content of applied in boiler rebuilding.
应用在机械炉排燃煤工业锅炉改造上的条件及内容。
补充资料:3200m~(3)高炉和环形出铁场(武汉钢铁公司新3号高炉)
3200m~(3)高炉和环形出铁场(武汉钢铁公司新3号高炉)
-·,川-一、 、书.鑫氢
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条