1) well construction and brine extracting process
建井和采卤工艺
1.
Aiming at analyzing the well construction and brine extracting process in 10# well pair,the gain and loss of this process is studied for reference for future use in similar wells and the recycling scheme on the basis of the status quo of 10# well pair i.
本文着眼于10#井组的建井和采卤工艺分析,研究该工艺的得与失,为将来类似的矿盐开采提供借鉴,并就10#井组目前现状探讨其再利用方案。
2) brine extraction process
采卤工艺
1.
This paper introduces the characteristics of three brine extraction processes in Yewu Salt Field.
介绍了叶舞盐田三种采卤工艺的特点,采卤工艺发展状况,从环保的角度考虑,小井距连通井是以后叶舞盐田开发的适用井型。
3) Process pipe
采卤工艺管
4) well-constructing technology
成建井工艺
1.
Discussion on well-constructing technology of special hydrogeologic well in strata with low permeability;
低渗透地层专门水文地质孔成建井工艺探讨
5) Brine mining in deep well
深井采卤
6) saline well
采卤井
补充资料:采气工艺(见天然气开采工艺)
采气工艺(见天然气开采工艺)
gas production technology
,一‘J\匕乙吕天然气开采工艺pro以uetionteehnology)见
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条