2) major overhaul cycle
大修周期
1.
Practice in extension of ISP major overhaul cycle;
延长ISP工艺大修周期的生产实践
3) maximal options
极大期权
1.
As a class of non-plain vanilla options,the maximal options are different from vanilla options on some items and even more complex.
极大期权是一类非标准化期权,与标准期权在某些条款上存在差异,比标准期权更复杂,因此不能用标准期权的定价公式对这类期权进行定价。
4) maximum tardiness
最大拖期
1.
Algorithm for single machne schedule with sequence dependent setup to minimize maximum tardiness;
单机序列相关Setup最小化最大拖期算法
2.
The NP-hard problem of scheduling N jobs on a single processor with due dates and sequence-dependent setup times is studied,where the objective is to minimize the maximum tardiness.
研究了具有序列相关Setup带交货期的单机调度NP问题,优化目标是最小化最大拖期。
5) overhaul time
大修期
1.
Considering speedometer readings at previous overhaul times and combining modern forecasting theories,a forecasting model based on index regression and gray forecasting theory is established to forecast the next overhaul time of the vehicles used on construction site.
基于已有的建筑用汽车大修期间仪表上显示的行驶公里数,结合现代新的预测理论技术,提出一种指数回归—灰色理论相结合的线性优化组合预测模型来预测其下一个大修期。
6) incipient fire
初期大火
补充资料:大期
1.指妇女足月分娩的日期。 2.指死期。 3.共同的意愿。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条