1) positive stage
实证阶段
1.
Theory of economic liberalism has undertaken theological, metaphysic, and positive stages.
经济自由主义理论包括三大发展阶段 :神学阶段、形而上学阶段和实证阶段。
2) visa stage
签证阶段
1.
From preparing stage before construction,collection and visa stage during constructing process,settlement material arrangement in finishing stage and claims stage,it elaborates and analyzes on how to do well in project claims,so as to reduce cost and create larger benefit space for enterprises.
从工程施工前的准备阶段,施工过程的收集、签证阶段,工程竣工结算时的资料整理,索赔立项等阶段对如何搞好工程施工索赔工作进行了分析阐述,以降低成本,为企业创造更大的利润空间。
3) implementation stage
实施阶段
1.
Measures to strengthen cost control in project implementation stage by construction part;
浅谈建设方如何加强工程实施阶段的造价控制
2.
Schedule and investment management in implementation stage of engineering project based upon PDCA method;
对工程项目实施阶段进度及投资进行PDCA管理
3.
On the cost control in the construction project implementation stage;
浅谈建设项目实施阶段的造价控制
4) construction process
实施阶段
1.
Cost management in the construction process consists of bidding management, construction management and closing account management, to which the article approaches.
工程实施阶段的造价管理可分为三个环节:招标管理、施工管理和结算管理,文章就实施阶段的工程造价管理进行分析探讨。
2.
Analyzing the cost control during the construction process of electric power transmission and transformation process,making specific expatiation of foundation of cost control,key points and effective method for reducing the cost of projects and promoting the development of transmission and transformation industry.
对送变电工程项目实施阶段的造价控制方法进行分析 ,就造价控制的基础、关键环节和有效手段进行详细阐述 ,以降低送变电工程成本 ,推动送变电事业的发展。
5) executing stage
实施阶段
1.
Project cost management in executing stage of project item construction;
谈工程项目建设实施阶段的工程造价管理
2.
The contract price of a project is the goal of the construction cost control in executing stage The invest- ment in this stage is much bigger than that of other stages.
建设项目实施阶段(即施工阶段)的工程造价控制目标就是工程承包合同价,此阶段的工程投资强度远远高于其它阶段。
6) construction stage
实施阶段
1.
According to some aspects of investment control of building project construction stage,author provides some ideas about investment control in full course of construction,which based on combination of theory and pratice.
从全过程投资控制的理念出发,考虑建设项目实施阶段投资控制的几个方面,从理论与实践的结合上提出意见。