2) key technical points
技术要点
1.
Raising geese key technical points and their integral utilization in Xinyang area;
信阳地区养鹅技术要点和综合利用
2.
Based on the application of construction diversion in land excavation engineering of inland waterway,and in combination with the characteristics of land excavation of inland waterway,this paper analyzes the main factors influencing the implementation of construction diversion,and points out key technical points shall be paid attention to during construction.
通过施工导流在内河航道干地开挖施工中的应用,结合内河航道干地开挖的具体特点,分析影响施工导流成败的主要因素,介绍了在施工中应注意的主要技术要点。
3) main technical points
技术要点
1.
The main technical points on PPVC waste water treatment in Shanghai Chlor - Alkali Chemical Indusrty Stock Co.
介绍了用絮凝剂处理废水的机理,总结了上海氯碱化工股份有限公司PPVC废水处理的技术要点。
2.
The improving design, structure and main technical points in manufacturing of the mould is introduced in detail.
对联轴器橡胶护套模具原结构设计及生产中存在问题进行分析,较为详细介绍了该模具设计的改进方案、模具结构以及制造中的技术要点。
4) technical point
技术要点
1.
The establishment and its technical points of reproducing system of good tree clones of Ginkgo biloba L. in Guangxi;
银杏优良单株繁殖体系的建立与技术要点
2.
Measurements taken for reduce of deformation and technical points in processing were presented as well.
分析了折边模折边浮块线切割加工工艺思路 ,介绍了减少变形的措施和加工中的技术要
3.
The technical points of an unconventional water proof layer arrangement in roof structure are discussed in connection with the construction practice.
结合工程设计实践 ,对倒置式屋面防水设计中应注意的技术要点进行了分析研究 ,并对设计质量的控制提出了要
5) technical points
技术要点
1.
On Technical Points and Analysis of Back-Faced Sliding Movement In Putting the Shot;
背向滑步推铅球的技术要点及其分析
2.
Key link and technical points of engineering supervision for building curtain wall
建筑幕墙工程监理的关键环节和技术要点
3.
4 contract section of Liuxia to Wangjiabu in Hang-Hui express highway,this paper introduces the reinforced skeleton frame processing of the pier column and the construction technique of installing,discussises the process,technical points,detection and evaluation of the electroslag pressure welding,which can provide the reference for the similar projects.
根据杭徽高速公路留下至汪家埠段第四合同段高架桥"Y"型墩柱的施工实践,介绍了墩柱钢筋骨架加工、安装施工工艺,就电渣压力焊的工艺、技术要点和检测评价作了详细的阐述,可供类似工程参考。
6) Technical main point
技术要点
1.
Connecting with environmental problems in the coal mining areas,the article has analyzed the influences to the life of the mining area in habitant from this adverse condition,has studied the basic principle and the technical main points of residential environment construction,to improve the living circumstance of the people in mining areas and ma.
就如何为矿区居民建设一个舒适、环保、安全、和谐的住区环境进行了探讨,结合煤矿区自然环境问题及人文社会环境问题,分析了此环境条件对居民生活的影响,研究了在此环境条件下住区环境建设的基本原则与技术要点,以改善矿区居民的生活环境,使矿区的社会环境更加和谐。
2.
This paper discusses the basic theory, applied region and technical main point of the hillside cultivated alleg directed regional field.
阐述了坡耕地垄向区田的基本原理、应用范围及技术要点。
补充资料:84K杨育苗技术要点
84k杨高大挺拨,树形优美,其苗木生长量大,抗寒、抗旱、抗病虫,既是绿化西北的先锋树种,又可用于城镇绿化。实践中发现其扦插成活率不高、主要是苗农把育欧美107、108的方法用于84K杨育苗。为避免类似情况发生,现将其育苗技术要点介绍如下:
苗圃地选择选择地势平坦,有水源条件,土质疏松肥沃的沙壤地块。扦插前每亩施有有机肥3000至4000公斤,然后深翻,耙平,做成苗床,最好铺上地膜,也可起垄。
扦插时间本着适时提早的原则,从土壤解冻后开始,一般在3月底前完成。
插穗准备及处理
插穗剪截选择一年生苗作种条,只剪其基部和中部,因为梢部扦插成活率低,可将其用于嫁接。插穗长度必须在20厘米以上,否则贮藏营养不够,将导致回芽现象。
插穗处理每15至20条插穗捆成一捆,放入装有清水的容器中浸泡5至7天,每天换1次水。插穗取出后,淋干表面水分,将其下部浸入300ppm至500ppmABT2号生根粉中(ABT2号生根粉倒入非金属容器中,每克生根粉加酒精或高度白酒3克,溶解后再对水;也可用直接溶于水的ABT6号生根粉代替)。
扦插按每亩插3500株左右,株距30厘米,行距65厘米,插穗顶端基本与土面相平。
灌水插后立既灌水一次,要小水漫灌,一定要灌足。5至7天再灌一次水,以后始终保持土壤湿润,直到幼苗长到40厘米左右。如幼苗出土展叶较小时,出现墒情不好,会大大降低成活率,所以幼苗出土期保持一定土壤湿度最关键。
除草如果扦插未铺地膜,注意不要松土除草,否则会活动插穗,影响成活率,灭草时要使用除草剂。(来源:中国花卉报2003-02-25)
苗圃地选择选择地势平坦,有水源条件,土质疏松肥沃的沙壤地块。扦插前每亩施有有机肥3000至4000公斤,然后深翻,耙平,做成苗床,最好铺上地膜,也可起垄。
扦插时间本着适时提早的原则,从土壤解冻后开始,一般在3月底前完成。
插穗准备及处理
插穗剪截选择一年生苗作种条,只剪其基部和中部,因为梢部扦插成活率低,可将其用于嫁接。插穗长度必须在20厘米以上,否则贮藏营养不够,将导致回芽现象。
插穗处理每15至20条插穗捆成一捆,放入装有清水的容器中浸泡5至7天,每天换1次水。插穗取出后,淋干表面水分,将其下部浸入300ppm至500ppmABT2号生根粉中(ABT2号生根粉倒入非金属容器中,每克生根粉加酒精或高度白酒3克,溶解后再对水;也可用直接溶于水的ABT6号生根粉代替)。
扦插按每亩插3500株左右,株距30厘米,行距65厘米,插穗顶端基本与土面相平。
灌水插后立既灌水一次,要小水漫灌,一定要灌足。5至7天再灌一次水,以后始终保持土壤湿润,直到幼苗长到40厘米左右。如幼苗出土展叶较小时,出现墒情不好,会大大降低成活率,所以幼苗出土期保持一定土壤湿度最关键。
除草如果扦插未铺地膜,注意不要松土除草,否则会活动插穗,影响成活率,灭草时要使用除草剂。(来源:中国花卉报2003-02-25)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条