2) Thoron level
气土水平
3) earth pressure balance(EPB)
土压平衡
1.
Adopting the adaptive network-based fuzzy inference system,a earth pressure balance(EPB)control model with the real-time measured data of earth pressure,thrust force and thrust speed as three inputs,and the speed of screw conveyor as output was designe.
分析了影响盾构土压平衡的掘进参数之间及其与土仓压力间的相互关系,采用自适应神经模糊推理系统(ANFIS)建立了一个以推进力、推进速度、土仓压力实时数据采样值为输入,螺旋输送机转速为输出的基于排土控制的盾构土压平衡控制模型。
2.
Theoretical equations by analyzing earth pressure balance(EPB) shield cutterhead′s cutting the ground are deduced and the numerical model is set up.
通过对土压平衡盾构掘进机刀盘切削土体进行理论分析,建立数学模型,得出相应计算公式。
4) land leveling
土地平整
1.
Triangular meshes method for land leveling earthwork calculation;
土地平整中土石方量计算的三角网格法
2.
Articles published about land consolidation mostly discussed earth volume computation without mentioning land leveling project model,which is not favorable for the proceeding of land leveling.
以前的土地整理方面文章中没有土地平整工程模型研究,涉及到的往往都是些土方量计算,这不利于土地平整工作的顺利开展。
3.
Land leveling is one of the most important items in land consolidation,and the precision of land leveling not only affects the land quality after consolidation,but also has an impact on the investment and benefit.
土地平整工程是土地整理项目的重要内容之一,土地平整的精度不仅影响到整理后的土地质量,而且关系到投资大小与效益问题。
5) soil body principle of balance
平衡土体
6) earth pressure balance
土压平衡
1.
Analysis of reasonable thrust force during tunnel excavation in homogeneous soft ground by use of earth pressure balance shield machine;
均匀软质地层条件下土压平衡盾构施工的合理顶进推力分析
2.
Realization of earth pressure balance for shield tunnelling machine;
盾构掘进机土压平衡的实现
3.
Based on the tunnel construction between Gubei Road Station and Zhongshan Park Station, this paper introduces the design and manufactumg techniques, features and application of the frst homemaclc earth pressure balance shield machine in the tunnel construction of metro.
以上海轨道交通古北路站-中山公园站区间隧道为工程背景,介绍我国首台用于地铁隧道施工的加泥式土压平衡盾构掘进机的设计制造工艺、技术特点和工程应用情况。
补充资料:平土
1.指平原之地。 2.平整土地。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条