1) resource-constrained projects
资源约束项目
1.
Although the existing critical activity concept and its identification method are valid for projects without resource constraints,they are not very valid for resource-constrained projects,especially in situations involving more than one unit of renewable resource.
现有关键工作概念及其识别方法虽然适用无资源约束项目,但并不完全适用资源约束项目,尤其不适用可重复使用资源量超过一个单位的项目。
2) multi-resource-constrained project
多资源约束项目
1.
Optimization scheduling research of multi-resource-constrained project based on mixed-intelligence algorithm;
基于混合智能算法的多资源约束项目优化调度
4) Stochastic resource constrained project scheduling
随机资源约束项目调度
5) resource constrained project scheduling problem
资源约束项目调度问题
1.
After reviewing the development history and researching actuality of RCPSP, this paper brings forward a new heuristic ? a MIN-Q based heuristic for multi-resource constrained project scheduling problem combining with CPM and seriation optimization theo.
资源约束项目调度问题是项目进度管理中的典型问题。
6) multi-mode resource constrained project scheduling problem
多模式资源约束项目调度问题