说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最短路径关键点
1)  critical nodes of shortest path
最短路径关键点
2)  way-point planning
路径关键点
1.
,the semi-autonomous telecontrol is implemented using the navigation image based way-point planning.
该系统采用主从遥控和半自主控制相结合的导航控制方式,通过无线视频传输实现超视距远程遥控,通过基于导航图像的路径关键点规划实现半自主导航。
3)  shortest route for point to point
点对点最短路径
4)  single-source shortest-paths
单源点最短路径
5)  critical path
关键路径
1.
The earned value analysis in project schedule based on critical path;
基于关键路径的项目进度挣值分析
2.
Workflow critical path algorithm based on activities;
基于活动的工作流关键路径算法
3.
The activities sequence in critical path of highway project network;
道路工程项目网络关键路径中的活动排序问题
6)  key path
关键路径
1.
Study of time parameter and key path arithmetic in engineering building project network planning;
工程网络计划的时间参数与关键路径算法研究
2.
Affecting factors analysis of major equipment erection key path in PWR NPP;
压水堆核电站主设备安装关键路径影响因素分析
3.
Based on the utility analysis in the economics,by searching the key path between a traffic mode and another transfer mode in the intermodal transfer points,a utility cost model is put forward to evaluate and optimize the facilities layout alternatives of the urban intermodal passenger transfer points.
利用经济学中效用分析法,通过寻找枢纽内存在换乘的任何2种交通方式之间的关键路径,建立枢纽内设施不同布局方案的效用损失模型,以此评价和优化枢纽内设施布局方案。
补充资料:关键路径法
分子式:
CAS号:

性质:又称关键线路法。一种计划管理方法。它用网络图表示各项工作之间的相互关系,找出控制工期的关键路线,在一定工期、成本、资源条件下获得最佳的计划安排,以达到缩短工期、提高工效、降低成本的目的。CPM中工序时间是确定的,这种方法多用于建筑施工和大修工程的计划安排。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条