1)  the construction of "为·名1/ 之 ·名2"
"为·名1/ 之 ·名2"结构
2)  the construction of "作·名1/ 之 ·名2 "
"作·名1/ 之 ·名2"结构
3)  "noun_1 + noun_2" structure of modern Chinese
现代汉语“名1+名2”结构
4)  zhi(之)
1.
The Auxiliary Word "zhi(之)" in the Unearthed Literature of the Warring States Period;
出土战国文献中助词“之”的研究
5)  zhi
1.
Wei- zhi- noun structure in ancient Chinese;
古汉语"为·之·名"结构辨析
2.
Further Thoughts on Zhi Between Subject And Predicate;
再论用在主谓之间的“之”字
3.
The so-called utilization of the pronoun "zhi" transferred into the second-person pronoun is analyzed based on the context.
结合语境对常见的所谓用为第二人称“之”字句进行分析,根据篇章语境原则,汉语文化语境原则及言语交际的合作原则,从语用意义看,第三人称代词“之”活用为第二人称代词之说难以成立。
6)  zhi
“之”
1.
Nowadays, in the academic field there are still different views on the part of speech, the meaning, and the function of the character zhi put before attributes in archaic Chinese.
古汉语里形容词前的“之”,就词性、意义和作用看,学界至今有不同的看法。
2.
Based on previous achievements, the article further investigates the structures of 揤erb·Zhi (Qi )·Noun”in XianQin,and thinks that Zhi can serve as possessive case and Qi can serve as objective case, that 揤erb such as Qu ·Qi ·N”is the same double-object structure as 揤erb such as Qu ·Zhi ·Noun”.
在前人研究的基础上本文对先秦“动·之(其)·名”结构作了重新考察,进一步论证了“之”可作领格,“其”可作宾格。
参考词条
补充资料:真名川坝

真名川坝

Managawa Dam


概  述

  真名川坝位于日本福井县大野市、九头龙川水系(Kuzuryugawa)真名川上,距大野市约12km。混凝土拱坝,最大坝高127.5m,水库总库容1.15亿m3。电站装机总量1.4万kW。工程目的为防洪、灌溉和发电。1967年开工,1979年3月竣工。
  坝址两岸谷坡平均为40°~50°,河床20~30m之间为悬崖。基岩主要由飞驿片麻岩构成,岩脉较多。坝址上游约250m处有横切河流方向的大断层,而坝址无大断层,但有宽约20~50cm的小规模断层和宽10cm以上的裂隙。弹性模量7000MPa。
  坝址控制流域面积223.7km2,多年平均径流量10m3/s,水库面积293hm2,水库长度约12km。有效库容0.95亿m3,泥沙淤积库容0.02亿m3,调洪库容0.089亿m3。设计泄水量2700m3/s。正常水位365m,最高洪水位385m。死水位331m,泥沙淤积面331m。
  建筑物包括大坝、溢洪道和发电站。
  大坝坝顶长357m,坝顶高程387.5m,坝体积50.8万m3。溢洪道为坝顶溢流堰,设4扇宽12m,高9.6m弧形闸门,泄洪量2500m3/s。发电进水口设2扇高压定轮闸门,高4.0m,宽3.9m。放水孔1个,装有直径1.4m的空注阀,流量14m3/s。厂房为坝后式,最大装机容量1.4万kW,发电量0.664亿kW·h。最大发电洪流量15m3/s。
  坝体开挖总量59.5万m3。采用1条直径5.7m的隧洞导流。混凝土运输采用20t缆索起重机。混凝土日最大浇筑量为1800m3

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
©2008 dictall.com