1) assessment in pronunciation
语音评定
2) perceptual speech analysis
语音评估
1.
Method:16 consecutive patients were investigated with nasoendoscopy,lateral cephalometrics and perceptual speech analysis.
方法:运用主观语音评估、头颅侧位X线咽腔造影及鼻咽纤维镜对16例非综合征性腭裂患者术后的腭咽功能进行评估,分析三种检测方法之间的一致性。
3) Speech assessment
语音评价
1.
Considering the demand of Chinese speech assessment system design,and according to the DTW algorithm and the Mandarin characteristics,two of C/V segmentation algorithms in Chinese syllable are studied and implemented.
文章从汉语语音评价系统设计的需要出发,针对DTW算法和汉语音节的特点,研究并实现了汉语音节中声母和韵母分割的两种算法,算法依据的基础都是依据不同类语音段数据相异的原理。
4) Speech Evaluation
语音评分
1.
Application Research of Speech Evaluation in Embedded System Based on Characteristic Comparison;
基于特征比较的语音评分在嵌入式系统中的应用研究
2.
In the paper, the speech evaluation is based on the standard speech.
本文采用的语音评分是基于标准语音的评分;所运用到的技术有特征参数的提取、模式比对方法的设计以及评分机制的建立等。
5) speech localization
语音定向
1.
Study on speech localization technique in a reverberation room;
有混响条件下的室内语音定向技术的研究
6) phonetic setting-ups
语音设定
补充资料:《房屋修缮工程质量检验评定标准》
《房屋修缮工程质量检验评定标准》
《房屋修缮工程质量检验评定标准》中国建设部颁布的规章之一。房屋修缮施工单位对完成的工程项日,要根据《房屋修缮工程质量检验评定标准》评定质量等级.进行竣工验收,不合格的不准交工。在工程正式交验前应预检,对整个工程项目、设备运转情况及有关技术资料全面进行检查,对检查出的问题应做好记录,定期解决,然后才邀请发包、设计单位正式验收。竣工验收的依据一般应包括:工程合同、修缮设计或修缮方案,及有关图纸或技术说明、会审交底记录、设计变更鉴证、材料试验报告单、隐蔽工程验鉴记录、房屋设备安装试调和试压记录等技术资料。竣工交验标准是:全部完成合同及设计(方案)要求的工程内容,质量符合标准及设计(方案)要求;具备住用条件,门窗开闭灵活、严密,灯亮,水通,煤气通,烟道通,暖气热,装修设备完好,场地整洁,排水和道路畅通,余料弃土清理完毕;技术资料齐全、准确;作出质量评语,填写单位工程质量评定表;原有修缮设计图纸的工程,要提交竣工图。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条