1) line-node
线结点
1.
IDDQ test is suit for the bridging falt test in CMOS circuits, In this paper,Several basic concepts on IDDQ test of CMOS circuits has been given, IDDQ testable condition has been studied, and IDDQ testability of bridging faults of the line-nodes in static COMS circuits been has been proven theoretically.
IDDQ测试方法最适合CMOS电路桥接故障的测试 ,给出CMOS电路IDDQ测试的几个基本概念 ,探讨了桥接故障IDDQ可测性条件 ,从理论上证明了静态CMOS电路线结点桥接故障的IDDQ可测性 。
2) binodal
[bai'nəudl]
双结点线
1.
Thermodynamic properties of PSf-DMAc-alcohols ternary systems are studied,the binodal is calculated.
对聚砜(PSf)-二甲基乙酰胺(DMAc)-醇类非溶剂构成的制膜体系的热力学特性进行了研究,计算出这些体系的双结点线,并用这些醇类非溶剂通过光散射法进行浊点滴定实验,浊点曲线与双结点线基本重合,验证了双结点线的计算结果。
3) point line combination
点线结合
1.
This paper discusses the proof of the point line combination problem by applying desargues theorem,pappus theorem,central projection method and harmonic property of the complete quadrangle.
结合实例探讨了利用Desargues定理及其逆定理证明点线结合问题,利用Pappus定理证明点线结合问题,利用中心投影把直线投射到无穷远证明点线结合问题,利用完全四点形的调和性质证明点线结合问题。
4) line-point structure
线点结构
5) junction point of traverses
导线结点
6) borderline node
边线结点
补充资料:点接触结(pointcontactjunction)
点接触结(pointcontactjunction)
简便的方式是将超导体一削尖的端点(约0.1μm端径)施压在另一超导体小面上而接触成点接触结,它是一种弱连接。由于压力可调节,就可选择最好所需最适宜接触性能。点接触结可用于制作磁强计和微波接收与发射等装置。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条