说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 高坝溢洪道
1)  High dam spillway
高坝溢洪道
2)  crest spillway
坝顶溢洪道
1.
Stability analysis of the chute bottom slab with the horizontal anti-slide slab for the crest spillway of rockfill dam;
堆石坝坝顶溢洪道带有水平阻滑板泄槽底板的稳定分析
2.
The stability analysis and stress calculation for the chute bottom slab with anchorage of crest spillway of rockfill dam gives the anchorage parameters, relationship of various forces and its safety coefficient expressions, which provides the theoretical calculati.
通过对堆石坝坝顶溢洪道带有地锚的泄槽底板进行稳定分析和内力计算,得出地锚参数与其所受各力之间的关系式和安全系数表达式,为今后的工程设计提供理论计算方法,经实例验证该方法是可行的。
3)  spillway on the dam
坝体溢洪道
1.
At the same time ,using local discardable material adequately,predigesting pivot disposition,construction process was accelerated,the project investment was cut down;In structure designs of the spillway on the dam, cur.
其设计特点是:根据坝址实际地形、地质条件,将溢洪道直接布置在堆石坝体上,同时,充分利用开挖弃料,简化了枢纽布置、加快了施工进度、降低了工程造价;在坝体溢洪道结构设计上,采用了曲线型实用堰、叠瓦式构造连接的掺气槽、阻滑板和预埋锚固拉筋、高性能混凝土等措施,从而提高了溢流堰泄流能力、抗蚀减振能力和泄槽适应变形的能力,增加了坝体溢洪道的安全稳定性。
4)  dam-body spillway
坝身溢洪道
1.
The rockfill dam with concrete face slab for the lower reservoir of the Tongbai Pumped Storage Power Station adopted the dam-body spillway in accordance with its concrete conditions.
到目前为止,世界上已建成的采用坝身溢洪道的面板堆石坝仅有3座,有关这方面的研究国内外均处于起步阶段。
5)  bottom discharge tunnel
坝底溢洪隧道
6)  overshot spillway
坝顶泄槽溢洪道
补充资料:阿斯旺高坝
阿斯旺高坝
Aswan High Dam

   埃及尼罗河上具有灌溉、发电、防洪等综合效益的大型水利工程。位于开罗以南约700千米,水库总库容1689亿立方米。坝基岩层为花岗片麻岩,覆盖层很厚,最深处有225米。坝系粘土心墙堆石坝,最大坝高111米,顶宽40米,底宽980米,坝顶长3830米,坝轴弯向上游,半径1400米。坝基防渗采用与心墙连接的上游水平铺盖和心墙下的帷幕灌浆,帷幕最深处有170米,厚度自上而下由40米减至20米。电站厂房位于右岸边,利用施工期6条直径15米的导流隧洞改建成发电与泄洪合一的引水隧洞,装机12台,共210万千瓦。最大泄洪量6000立方米/秒。工程于1961年开工,1970年竣工。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条