1) coalmine director
煤矿矿长
1.
Either the coal-producing permission requirements or the safe-production requirements for coalmine, both prescribe the necessary requirements for coalminers as well as the coalmine director , while there exists a contradiction in the two laws.
在煤炭生产许可条件和煤矿安全生产许可条件中,均有煤矿矿长和特种作业人员从业资格或条件的规定,但对这两种从业人员资格或条件的许可或认定的标准却不统一。
2) Changhe coalmine
长河煤矿
1.
The Changhe coalmine belongs to a geological structurally medium complexity area.
长河煤矿为地质构造中等复杂区,其矿区地质及水文地质条件表明,地表水、直接充水含水层煤系砂岩裂隙水、老窑水、构造断裂带水都可构成该矿井开采的充水因素,且其涌水量大小与大气降水关系密切。
3) Changgou mine
长沟煤矿
1.
According to the ocurrence of 15th coal seam in Changgou mine,the author analyzed the method of coal mining from the view of mining technology.
根据太原煤炭气化(集团)有限责任公司长沟煤矿15号煤层赋存情况,从采煤技术上分析适合长沟煤矿的采煤方法,特别是通过顶煤冒放性分析,科学合理地对15号煤层采煤方法进行了确定。
6) Changguang Coal Mineral Power Plant
长广煤矿发电厂
1.
Through the analysis of the number of faults of 2# unit governing system in Changguang Coal Mineral Power Plant and the relative treatment, this paper demonstrates the effect of turbine oil quality on the governing syste
叙述了浙江长广煤矿发电厂 2 #机组调速系统发生的一系列故障及其处理过程 ,分析说明透平油质好坏会对调速系统直接造成影
补充资料:辉锑矿长柱状晶体
辉锑矿长柱状晶体
------一-一-一翻黯!辉锑矿长柱状晶体
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条