1) net present value calculation
净现值计算
1.
The concept of net present value,the calculation method,the time comparability and the impact of cash flow on net present value calculation are introduced.
介绍了净现值的概念、计算方法、净现值分析的时间可比,以及现金流对净现值计算的影响,提出净现值分析法用于一些不确定条件下的决策分析有独特的长处,对于任何项目(含功能替代和不含功能替代)都可用净现值法直接进行比较,且在净现值计算时要以全投资现金流为依据,这样计算出的结果才是有意义的、可靠的。
2) present value computation
现值计算
1.
The application of present value computation in engineering bidding and quoting were illustrated by some examples,based on which the suggestion of construction enterprise should increase the quote price for antecedent project in order to achieve the intention of favoring to capital turnover and increasing income of the enterprise.
本文通过举例说明现值计算在工程投标报价中的应用,建议施工企业在投标报价中尽量增加前期工程的报价,达到利于工程资金周转,提高企业收益的目的。
3) annualized net present value
折算年度净现值
5) calculation of discount net valu?
贴现净额计算
6) calculation of present worth
兑现率计算,现值计算
补充资料:调整后的净现值(adjustednetpresentvalue)
跨国投资项目经济评价指标。投资项目经济评价的基本指标是净现值和内部收益率。但在国际投资决策会计中,监于跨国投资项目的特殊要求,以跨国公司总公司为主体进行经济评价,应将净现值指标转化为调整后的净现值指标。调整后的净现值与净现值的涵义基本相同,其区另主要体现在:(1)按不同类别的现金流量分别进行折现,大同小异不是对所有的现金流量统一进行折现。与此相联系,对不同类别的现金流量区别不同情况采用不同的折现率,而不是按一个统一的折现率进行折现;(2)投资项目的效益性可以分段测算。如果前段的测算在经济上已可行,后段追加的有利部分可以不计算;(3)从总体上说,具有较大的包容性,能够更好地适应跨国投资项目经济评价的具体需要。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条