说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 设计-建造总承包
1)  Design-build general contracting
设计-建造总承包
1.
Under Design-build general contracting mode,contractor takes great risk.
设计-建造总承包模式下,承包商承担的风险非常大。
2)  design general contract
设计总承包
1.
Based on the above situation,this paper provides some suggestions such as using design general contract to coordinate each design units and improve the design quality,strengthening the project pre-planning,establishing feasible project management plan and implementing organization plan to promote the scientization and standardization of the construction management.
基于上述情况,提出采用设计总承包协调各设计单位工作、提高设计质量,加强项目前期策划工作,制定切实可行的项目管理计划和实施组织计划,促进施工管理的科学化、规范化,实行施工总承包模式,简化地方政府管理难度,保证施工质量的建议。
3)  general contract construction project
总承包建设项目
1.
Through the practice of the files management in the geneal contract construction project,this paper expounds the general contract project and its features of files management,importance,and the files management duty,management mode,documents collection scope and putting in order method of the subcontract during the process of the general contract construction project.
通过总承包建设项目档案管理的实践,阐述了总承包建设项目及其项目档案管理的特点、重要性和在总承包建设项目过程中各分包单位的档案管理职责、管理方式、文件材料的收集范围及整理方法,指出了总承包建设项目档案管理目前存在的问题和解决的方法。
4)  design-build delivery method
设计施工总承包
1.
Discussion on the design-build delivery method bidding;
设计施工总承包招标探讨
5)  D-B
设计-施工总承包
1.
Application of D-B Model to Construction of the South Anchor of Wuhan Yangluo Changjiang Highway Bridge;
设计-施工总承包在武汉阳逻长江大桥南锚碇工程中的应用
6)  contract construction
承包建造
补充资料:承包人要求发包人维护勘察成果、设计成果的权利
承包人要求发包人维护勘察成果、设计成果的权利:发包人对于勘察设计人交付的勘察结果、设计结果,不得擅自修改,也不得擅自转让给第三人重复使用,发包人擅自修改勘察、设计成果的,对由此引起的工程质量责任,应由发包人自己承担;擅自转让成果给第三人使用的,应向勘察人、设计人负责。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条