1) agglomerative cost
聚集成本
2) low cost&focus competition
低成本集聚化
3) Integrated costing
集成成本
1.
Activity-based costing(ABC) work out comparatively accurate running cost,EVA highlight the capital importance,the Integrated costing system combine ABC and EVA index together,make equity and liability cost as enterprise asset resource consuming,and come out Activity-Capital Dependence(ACD) approach to interpret capital costing of each activity.
作业成本(ABC)提供了相对准确的产品经营成本信息,经济增加值(EVA)强调了资本成本的重要性,集成成本则集成了ABC和EVA指标,将权益和债务资本成本认定为企业的资本资源耗费,提出了作业-资本项目关系(Activity-CapitalDependence,ACD)分析,以解释每一作业耗用各项资本的金额。
5) ontology integration
本体集成
1.
Context-driven reconciliation in ontology integration;
本体集成中上下文驱动协调(英文)
2.
Evaluation criteria of ontology integration method & its application;
本体集成方法评价指标体系及其应用研究
3.
Research on Ontology Integration Based on E-Connections Theory;
基于E-Connections理论的本体集成研究
6) integrated ontology
集成本体
补充资料:聚集经济(聚集利益)(聚集效应)
n聚集经济(聚集利益)(聚集效应)是指由于某工业部 n门向某特定地域集中新产生的供生产成本降低的效果。因为分工协作,扩大生 产规模,节约使用基础设施等会降低生产成本。 n
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条