说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 无标底投标
1)  non-base auction
无标底投标
1.
With combination of order statistics and bidding theory,we consider optimal bidding strategy under non-base auction.
将次序统计量与拍卖理论相结合,考虑投标商在无标底投标形式下的最优报价策略问题,通过估计投标商报价的分布,可以通过蒙特卡罗模拟方式得到每一报价下投标商中标的概率,最终可依据最高中标概率和最高期望利润来计算最优报价。
2)  biding without base price
无标底招投标
1.
The risks and countermeasures of biding without base price;
浅议无标底招投标的风险及对策
3)  non-price bottom bidding
无标底招标
1.
It is the direction of the project bidding system reform to apply the non-price bottom bidding system under the mode of valuation with bill quality of construction works in China.
推行工程量清单计价模式下的无标底招标是我国工程招投标体制改革发展的方向和趋势。
2.
It is a conventional practice of non-price bottom bidding in international project realm.
工程项目无标底招标是国际工程界通行做法,我国亦于2003起推广无标底招标。
3.
The non-price bottom bidding is the inevitable development trend of construction market in china and also the main project transaction way after joining into WTO.
无标底招标是我国建筑市场发展的必然趋势,也是加入WTO后我国建设工程交易的主要方式。
4)  bidding without basic price
无标底招标
1.
Discuss on the bidding without basic price in building industry after China entered into WTO;
论我国建筑业加入WTO后的无标底招标
2.
It introduces the meaning of bidding without basic price,analyses the advantages of bidding without basic price,and illustrates the attention in it from writing bid document,controlling the basic price of bidding,investigation,performance bonding,which guarantees the proceeding of bidding without basic price.
介绍了无标底招标的含义,分析了无标底招标的优越性,从编写招标文件、编制控制标底、做好考察预审、执行保证金制度等方面就无标底招标中应注意的问题进行了探讨,从而保证无标底招标的顺利进行。
5)  tendering without base price of bidding
无标底招标
1.
Bid valuating methods based on tendering without base price of bidding;
基于无标底招标的评标方法研究
2.
It researched how to perfect the tendering without base price of bidding and the selecting bid with reasonable low price in our county now.
本文对现阶段如何规范我国的无标底招标和合理低价法评标进行研究,以建筑招投标理论为基础,紧紧围绕无标底招标和合理低价法评标展开论述。
6)  non bid base method
无标底法
1.
According to analysis on characteristics of dam safety monitoring automation and factors influencing bidding , bid base method is compared with non bid base method for bidding of dam safety monitoring automation .
在分析大坝安全监测自动化工程特点和受招标影响因素的基础上 ,全面比较了大坝安全监测自动化工程招标的标底法和无标底法 ,在此基础上 ,得出了只有利用分项打分、综合决标的无标底法才能适合大坝安全监测自动化工程的具体情况的结
补充资料:标底


标底
bid

b 100d{标底(b id)工程“标的”的价格,是项目建设法人对划人标内的全部项目实施招标的期望价。水电站建设根据工程特点划分“标的”,一个标的只能有一个标底。在欧美国家是市场行情预测价,在中国.标底是用定额等计价标准编制的标准价格。标底应符合价值规律,有利于竟争和保证工程质量。一般控制在批准的概算限额内。在评标过程中标底是衡量投标报价是否合理的基准。标底必须保密。 标底由项目建设法人自行编制或委托具有资质的咨询单位编制。编制依据为:招标文件(包括标底内容.商务条款,技术条款,施工图纸,工程量清单等)、施工条件、当前施工技术和价格水平、法定的或合理的取费标准。标底编制方法采用制造成本法.包括直接成本(人工、材料、机械费用成本)和间接成本,并在总成本上加上必要的加价,包括承包方的总部管理费、不可预见费、利润、税金等。人工、材料、机械消耗量应是本工程标所消耗的必要劳动量,可根据国家和行业部门颁发的现行预算定额确定;或根据工程实际情况计算所需资源的配置。标底工程量采用国家或行业标准计算确定。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条