说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 收益补偿
1)  revenue compensation
收益补偿
1.
This paper comparatively analyzes the short-term proceeds between the suppliers and retailers under the model of vendor management inventory (VMI), brings out that a third party logistics and revenue compensation mechanism can be introduced to optimize VMI through the two perspectives of the costs of suppliers and the partnership in the supply chain.
文章在供应商管理库存(VMI)模式下通过对供应商与零售商短期收益的比较分析,从供应商自身成本和供应链合作伙伴两个角度提出,可以通过引入第三方物流和收益补偿机制两种途径对VMI进行优化,并运用博弈论方法对采用两种改进途径后供应商与零售商的收益进行了探讨,以期解决在VMI前期供应商合作激励不足的问题。
2)  mesne profit
租值补偿金;中间收益
3)  beneficial qualification about compensation funds for land expropriation
土地征收补偿受益资格
4)  benefit compensation
利益补偿
1.
The conception is discussed of the benefit compensation system of ecological and environmental protection, the compensating subject, the compensated subject and the object of the compensation are also analyzed, at the same time the article elaborates the path and way of the benefit compensation of the ecological and environmental protection.
探讨了生态环境保护利益补偿机制的概念、分析了补偿机制的受偿主体、补偿主体和补偿范围,同时还阐述了生态环境保护利益补偿机制的补偿途径和方法。
2.
Based on the benefit compensation mechanism,this paper built a two-player-three-phase dynamic game model to analyze the interagency information sharing process of government.
本文基于利益补偿机制,建立了分析政府部门间信息共享的两部门三阶段利益补偿动态博弈模型,并通过案例研究验证模型的可行性,为提高政府工作效率而采取的部门间信息共享和利益补偿方式提供了政策建议。
5)  compensation benefit
补偿效益
1.
Optimal selection of cascade reservoirs compensation benefit of the Yellow River mainstream based on AHP and catastrophe evaluation;
基于AHP和突变评价法的黄河干流梯级水库补偿效益方案优选研究
2.
Dynamic calculation of power generation compensation benefits of the Yellow River upstream cascade power stations in different level years;
不同水平年黄河上游梯级发电补偿效益的动态计算
3.
Power generation compensation benefit of the upper Yellow River in the first stage of the South-to-North Water Transfer West Route Project;
南水北调西线一期调水时黄河上游水力发电的补偿效益
6)  compensation benefits
补偿效益
1.
Formation and solution of compensation benefits simulation model of cascade reservoirs in the main stream of Yellow River;
黄河干流梯级水库补偿效益仿真模型的建立及求解
2.
Application of differential square method for sharing compensation benefits between cascade hydropower stations and for sharing costs between multipurpose water projects;
离差平方法在梯级水库补偿效益和综合水利工程费用分摊中的应用
3.
Application of deviation square method in sharing compensation benefits for a cascade hydropower station;
应用离差平方法进行梯级水库补偿效益分摊
补充资料:《矿产资源补偿费征收管理规定》


《矿产资源补偿费征收管理规定》
provision on the administration of the collection of the mineral resouces compensation

  kuangehan ziyuan buehangfei zhengshou guanli guiding《矿产资源补偿费征收管理规定》(provision。。theadnlinistration of lhe eolleetion of the而nelal resoucesCon〕pensation)国务院1 994年2月27日发布,同年4月1日起施行。共22条,另附费率表。主要内容包括:①矿产资介 《矿产资源补偿费征收管理规定》 (《人民日报》 1994年3月6日)源属国家所有,开采矿产资源必须按照本规定向国家缴纳矿产资源补偿费。②矿产资源补偿费由地质矿产主管部门会同财政主管部门征收,地质矿产主管部门负责具体征收工作,财政主管部门负责征收的监督工作。③矿产资源补偿费按照矿产品销售收人的一定比例计征。④采矿权人应按照规定的义务、纳费期限、结算方式和纳费对象及其费率标准缴纳矿产资源补偿费。⑤征收的矿产资源补偿费应及时、全额、就地上缴中央金库,年终按规定的比例中央与地方分成,单独结算并纳人国家预算实行专项管理,主要用于矿产资源勘查。⑥免缴或减缴矿产资源补偿费,必须报经省级人民政府地质矿产主管部门会同同级财政主管部门批准。⑦采矿权人采取伪报矿种、隐匿产量、销售数量或伪报销售价格、实际开采回采率等手段,不缴或少缴矿产资源补偿费的,将处以加征滞纳金、罚款的处罚,情节严重的,吊销其采矿许可证。(殷德仁)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条