1) earthquake damage and loss
震害损失
1.
Fast evaluation systems for earthquake damage and losses of lifeline engineering;
生命线工程震害损失快速评估系统
2) earthquake disaster loss
地震灾害损失
1.
The method of predicting earthquake disaster loss caused by damaged structures under earthquakes of various intensities is developed in this paper.
本文提出了预测城市建构筑物在不同烈度下地震灾害损失的简易方法。
2.
Combining with the practice of seismic field work, we discussed the earthquake disaster investigation and economic loss evaluation methods for education and sanitation systems on the basis of earthquake disaster loss evaluation method currently in effect.
结合地震现场工作实际,在现行地震灾害损失评估方法的基础上探讨了教育系统和卫生系统的地震灾害调查和经济损失评估方法。
4) expected seismic loss rate
震害期望损失率
1.
Applying the method of expected seismic loss rate,the rate making for seismic insurance of buildings considering the structural resistant capacity is analyzed.
利用震害期望损失率方法对考虑结构抗力因素的建筑物地震保险纯费率的厘定方法作了分析,并采用该厘定方法得到了两个工程实例的砖结构、钢筋混凝土结构的建筑物地震保险的纯费率。
5) damage
[英]['dæmɪdʒ] [美]['dæmɪdʒ]
损失,损害
6) life loss caused by earthquakes
地震灾害生命损失
补充资料:爆破震害控制
爆破震害控制
controlling seismic effect from blasting
baoPo zhenha一kongzhi爆破震害控制(eontrolling Seismic effeetfrom blasting)降低爆破地震强度,将震害限定在一定程度的技术。控制爆破地震危害,是爆破安全的必要手段。降震方法主要有三种。(l)微差爆破,其爆破地震波频率高、衰减快,可以实现ms级多段微差爆破,显著减少同时起爆的药量,以降低震动。(2)利用波的干涉作用,适当选择起爆时间间隔,在指定区域可实现波的干扰降震。(3)利用波通过不同介质时产生反射、折射和损耗,设置屏障降震。降震措施有预裂、光面、缓冲、孔内微差和斜线式多段顺序微差爆破等类型,合理应用将有最佳降震效果和较好经济效益。其要点:(1)尽量采用ms雷管新系列产品,新的系列有25一30段;延时精度显著提高;时间间隔趋于合理,便于爆破设计人员选择、调节间隔时间和控制每段药量,实现多段微差爆破。(2)临近边坡永久境界线的爆破,根据边坡岩体稳定性选用合适的降震措施,岩体整体性好的采用预裂爆破,岩体破碎、裂隙发育的采用光面或缓冲爆破。爆区宽度以不超过3Om为好。矿山边坡危险滑体下的爆破须限制一次爆破规模:炮孔不宜超过四排,爆区长度不宜超过滑体宽度的合一号。(3)在重要建筑物附近和危险边坡下方爆破时,尚需进行震动监测。 (韩子荣)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条