说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 风险经理制
1)  risk-manager-system
风险经理制
2)  risk manager
风险经理
1.
However,because it s in budding stage in China,Risk-Manager-System also brings a series of problems during its running,for example,its provision of the risk manager s responsibility is blurry,the domain of management is narrow,the restriction to risk manager is lack,the relationship between risk manager and client manager is ambiguity,and the qualities of risk managers are various.
为了加强风险管理,我国一些银行开始实行风险经理制,但我国风险经理制的发展尚处于初级阶段,在运行过程中存在对职责认识不清、管理领域狭窄、风险经理缺乏约束权力、与客户经理的关系没有理顺以及风险经理的素质参差不齐等问题,针对这些问题提出了相应的对策。
2.
The author points out that market risk,credit risk and operation risk should not be treated in isolation;rather, the independence of the risk manager in monitoring and reporting risks should be reflected in institutional design.
该文结合国际经验从多个角度对国内商业银行投资与交易风险管理模式的变革进行了思考,指出由于风险形态的不断变化,不能孤立地看待市场风险、信用风险和操作风险;应从制度设计上体现风险经理监测报告风险的独立性;对于风险计量应做到内外结合,使用适合商业银行的评估指标。
3)  Management risk control
经营风险控制
4)  risk in management
经营管理风险
5)  business risk manager
业务风险经理
6)  functional risk manager
职能风险经理
补充资料:基本建设前期工作项目经理负责制
      重点项目建设前期工作的任务、内容、进度落实到项目经理的领导责任制度。这一制度是中国在1983年编制第六个五年计划建设项目前期工作计划和第七个五年计划重点项目前期工作计划时开始正式执行的。
  
  项目经理的主要职责是:①组织可行性研究报告和设计任务书的编制,对该项目在技术上是否先进、可行,经济上是否合理,资源是否可靠,产供销是否平衡,协作、配合条件是否落实,进行科学论证,为国家对该项目建设决策提供正确的依据;②组织或监督初步设计的编制,制订项目的前期工作计划,报主管部门审批后实施。项目经理的主要权力是:①挑选或聘请项目的总工程师和经济师作为助手,独立公正地进行技术和经济分析,制定方案,并对工作成果的科学性、准确性承担责任;②支配和调剂该项目前期工作的资金,参与主管部门解决该项目外部条件的工作;③建立前期工作的各种责任制。项目经理必须遵循的原则是:从实际出发,按基本建设程序办事,以提高经济效益为中心,在技术经济比选中,注意采用成熟的新技术、新工艺、新设备、新材料。
  
  项目经理一般从项目主管部门的司局长、总工程师、副总工程师,或从各省(市、自治区)主管该项目的厅局长、总工程师、副总工程师中挑选和任命。大型企业的技术改造项目经理,除在上列范围挑选外,也可由该企业的总工程师、副总工程师或副厂长担任。
  
  建立基本建设前期工作项目经理负责制,是由前期工作本身的技术和经济特点(时间长、环节多、工作量大、涉及面广、复杂性强)所决定的。实行项目经理负责制,有利于加强重点建设前期工作,明确责任,事有专责,避免决策失误,使每项工程都做到质量优、工期短、投资省、效益好。
  