说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 逼仓风险指标
1)  squeeze risk index
逼仓风险指标
1.
Considering three different aspects of the stock,the open interest and the basis of futures and spot,the paper constructs the squeeze risk index(SRI) in futures markets.
从库存、持仓及期现基差三方面构建了期货市场逼仓风险指标
2)  corner risk
逼仓风险
1.
The Corner Risk Prewarning Model of The Futures Market and Application Research Based on SV Model and KLR Signal Approach;
基于SV模型和KLR信号分析的期货逼仓风险预警模型
2.
With a view to the corner risk of Chinese futures market,the present research begins with fluctuation risk of futures price,fluctuation risk of hold,earning rate in futures trade.
围绕中国期货市场的逼仓风险预警,选取期货价格波动率、持仓量波动率和收益率三个指标,通过函数加权得到了一个综合衡量逼仓风险的信号值,并建立了预警期货市场逼仓风险的模型。
3)  risk index
风险指标
1.
Voltage security assessment for on-line risk index and its sensitivity;
电压安全在线风险指标及其灵敏度评估
2.
Analysis on the applicability of water-supply risk indexes for water resources system during drought period;
干旱期水资源系统供水风险指标适用性分析
3.
According to the practice of control chart analysis (CCA) in the management of coal mine safety, it is showed that the application of control chart analysis in the statistical analysis of risk indexes can scientifically judge the developing trend of risk indexes, assess the improvement or degeneration of system and verify the effectiveness of safety measures.
根据实践,介绍控制图分析法在煤矿安全管理中的应用,将控制图法应用于安全风险指标的统计分析可以对风险指标的发展趋势作出科学判断,评价系统安全状态是否有明显好转或恶化,检验安全管理及技术措施是否有效。
4)  Risk indices
风险指标
1.
To combine the hidden danger indices and the risk indices, a scientific and practical dynamic method of safety assessment of ship manoeuvring is established using fuzzy.
然后把隐患指标和风险指标结合起来考虑,运用模糊综合评价方法,设计出一种科学、实用的动态综合评价狭水道内船舶操纵安全的方法。
2.
Risk management is one of the very important aspects of construction project management, and risk indices are one of the very important contents reflecting the risk of construction project.
风险管理是建设项目管理的一个非常重要的方面,而风险指标是反映建设项目风险状况进行风险分析的一个重要内容。
5)  depot bill risk
仓单风险
6)  risk assessment index
风险评价指标
1.
On the basis of the feature that the calculated parameter of Predicting Subsidence in Dewatered Cohesive Soil is adapt to interval analysis theory,the risk assessment model and two risk assessment indexes of satisfying different needs were established by using interval theory.
本文基于粘性土降水沉降量计算参数符合区间分析的特点,采用区间理论建立风险评价模型和满足不同需要的两个风险评价指标。
补充资料:利率风险指标


利率风险指标


【利率风险指标】评估在市场利率变化时,银行资产收益和价值与负债的成本和价值所发生的不利于银行的变化程度的指标。评估这种风险的指标是:利率风险比率 利率敏感性资产二利率敏感性负债利率敏感性资产是指在市场利率变化时其利息收人发生相应变化的资产;利率敏感性负债是指市场利率变化时其利息支出会发生相应变化的负债。如果银行拥有的利率敏感性资产与利率敏感性负债一样多,即此比率为1,当市场利率变化时,负债增加或减少的利息支出可以由资产利息收人的相应增加或减少来抵补或冲销。这样,银行不会因市场利率变化而受任何影响。如果此比率大于1,市场利率上升,银行收益将增加,因为利息收人的增加多于利息支出的增加;而市场利率下降时,由于利息收人的减少多于利息支出的减少,银行收益就会降低,从而给银行带来风险。反之,若此比率小于l,即利率敏感性资产小于利率敏感性负债,在市场利率上升时,由于利息收人的增加不及利息支出的增加,银行收益减少,这时会给银行带来风险;而当市场利率下降时,由于利息支出的减少多于利息收人的减少,银行收益就会增加。由于市场利率变化难于准确预测,银行为减少利率风险,一般都尽量使此比率接近于1。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条