1) whole process cost management
全过程工程造价管理
2) entire process
全过程
1.
Research and Application of Cost Control in Entire Process in Real Estate Project Development;
房地产开发项目全过程成本控制研究与应用
2.
Government Investment in Afforestation Projects Entire Process Regulation System Research;
政府投资营造林项目全过程监管体系研究
3.
The technical consulting services for the construction of Jilintai-I Hydropower Station involve all technical aspects and entire process of the project construction including hydrology,geology,hydraulic structures,electro-mechanical,construction and reservoir.
开展吉林台一级水电站工程建设的水文、地质、水工、机电、施工、水库等多专业的全过程技术和管理综合咨询工作,采用阶段性、专题性、及时性咨询方式,对建设过程中遇到的施工导流、筑坝材料、基础处理、边坡支护处理、泄洪建筑物布置及结构、施工进度安排及下闸蓄水等重大技术问题,及时提出切实可行的咨询意见,为建设单位提供决策依据,是工程建设安全可靠、经济合理、技术先进的重要保证,为工程顺利实现下闸蓄水和机组投产的既定目标奠定了良好的基础。
3) whole process
全过程
1.
Experiment simulation of whole process on coal self-ignition and study of dynamical change rule in high-temperature zone;
煤自燃全过程实验模拟及高温区域动态变化规律的研究
2.
Cost management of the construction project in the whole process based on the stakeholder theory;
基于利益相关者的建设项目全过程造价管理
3.
The whole process tracking audit in the construction engineering;
建设工程全过程跟踪审计浅探
4) Whole course
全过程
1.
Research on whole course follow-up auditing of engineering construction project of colleges and universities;
高校工程建设项目全过程跟踪审计研究
2.
The article starts with analysing the relation between the fabrication cost of the project and project quality,have probe into the stage that the fabrication cost of the project forms,has analysed the impact on the whole course especially stage of running of project quality,and has carried on further demonstration through an instance analysis,has provided the conclusion finally.
从分析工程造价与工程质量的关系入手,探讨了工程造价构成的阶段性,分析了工程质量对全过程特别是运营阶段的影响,并通过实例分析进行了论证,最后得出结论。
3.
Due to various problems now in the quality management in China, these suggestions aim at strengthening the quality supervision and quality control in the whole course of the capital construction.
在认真总结我国工程建设的基础上 ,通过学习借鉴发达国家先进的建设管理经验 ,针对目前国内建设工程项目质量管理中存在的问题 ,提出了加强工程项目建设全过程质量监督控制的观点和相应措
5) whole procedure
全过程
1.
Based upon analysis of the shortages existed in traditional cost management methods in our country improvement and whole procedure cost management suggestions are proposed.
对建设工程造价管理进行了介绍,分析了我国传统的建设项目造价管理方法的弊端,提出了进行建设工程造价管理应确立全过程造价管理意识的建议,就如何培养一支优秀的工程造价队伍进行了阐述,以达到加强工程成本控制,提高经济效益的目的。
2.
From authorization,bid invitation and submission,construction and other aspects the importance to strengthen engineering cost management and control is discussed,at the same time corresponding countermeasures are proposed in order to promote the apply of the whole procedure cost control to increase the competitive power and economic benefits for enterprises.
从工程项目的立项设计、招投标、施工、竣工等阶段探讨了强化工程造价管理与控制的重要性及有效对策,以在工程项目实施的全过程做好工程造价管理工作,从而提高企业经济效益,增强企业竞争力。
3.
From design stage,bid invitation stage,construction stage, completion stage and other aspects engineering cost management and investment control are discussed in order to increase investment benefits and promote the application of whole procedure cost management and increase cost management level in our country.
从设计阶段、招标投标阶段、施工阶段、竣工阶段等不同阶段深入地探讨了工程造价的成本管理与投资控制,以提高投资效益,促进工程造价全过程管理,从而提高我国工程造价管理的总体水平。
6) the whole process
全过程
1.
Control over building cost of a project should be had in the whole process of its construction;
工程造价控制应贯穿于项目建设的全过程
2.
In this process, people gradually know the control of construction project cost during the whole process is an effective control principle, which is discussed in this paper in detail.
在满足质量要求的前提下挖掘工程低造价的潜力是工程造价行业人士的毕生追求,在此过程中人们渐渐认识到“工程等造价全过程控制”是一种有效的控制方法,对此本文做出了详细的论述。
参考词条
补充资料:发电工程造价
发电工程造价
power project construction cost
fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。