说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 最大壅水
1)  maximum jammed water depth
最大壅水
1.
This paper studied the hydraulic factors of bridge site through the basic hydraulic principles, received bridge site s minimum shrunk rate of flowing section,maximum jammed water depth,and ordinary maximum scouring depth.
据桥位水流图示建立由水力学基本原理表示的方程组 ,通过方程组的分析讨论 ,得出桥位过流断面最小收缩比、最大壅水高度。
2)  maximum backwater height
最大壅水高度
1.
After founded and validated the two dimensional mathematical model,It proceeded flood capacity calculation to the MiaoPu preventing flood and revetment engineering at the combination of various hydrologies,obtained discharge area rate,maximum backwater height, backwater scope and velocity proper value etc.
通过建立和验证平面二维水流数学模型,对金海大道苗圃段防洪护岸工程进行了多种水文组合下的行洪能力计算,获取了工程的过水面积占据率、最大壅水高度、壅水范围及流速特征值变化等成果,以研究其对嘉陵江行洪能力的影响。
3)  backwater [英]['bækwɔ:tə(r)]  [美]['bæk'wɔtɚ]
壅水
1.
Experimental and theoretical study of skew bridge backwater;
斜交桥壅水试验研究与理论探讨
2.
Comparison of Existing Backwater Models for Bridge Piers in Subcritical Flows;
桥墩壅水的计算方法比较
3.
Experimental study on backwater of submerged dikes;
淹没丁坝群壅水试验研究
4)  dammed water
壅水
1.
Owing to located at the backwater effect end of 315 to water level of Sanmenxia reservior, the Dayudu area in the Yellow River was cause dammed water in the middle of January of 1996 when cold air overcasted with temperature falling down 5 to 7℃, which brought about ice accumulation in channel and ice blocking the river under discharge of around 300m3/s.
长时间的低温风雪天气,以及大风降温初期在黄河小北干流和潼关河段所形成的冰凌堆积,又直接导致冰塞壅水节节上延。
5)  choked flow
壅水
1.
Research on plenar 2-D mathematical model of bridge pier choked flow;
桥渡壅水平面二维数学模型模拟研究
6)  banked up water level
壅水水位
补充资料:最大的最大收益值准则
分子式:
CAS号:

性质: 也称最大的最大收益值准则。不确定型决策准则之一。其方法是:首先找出各方案的最大收益值,然后选择这些最大收益值中最大者所在的方案作为最满意方案。这个准则采取乐观主义态度,把方案最大收益值(或最小损失值)的自然状态,作为必然出现的自然状态采看待,从而把不确定型决策问题化为确定性决策问题来处理。选择最大收益值中最大的方案(对损失值来说就是选择最小损失值中最小的方案)作为最满意的方案,即取“最有利中之最有利”方案,所以亦称为“乐观的决策准则”。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条