说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 变形强迫
1)  Deformation forcing
变形强迫
2)  forced high-elastic deformation
强迫高弹形变
3)  topographic forcing
地形强迫
1.
The nonlinear balance equation(NBE) is used to diagnose the flow imbalance,and analysis indicates that the important role of the geostrophic adjustment and topographic forcing in the gravity-wave event in the snow storm.
并且通过非线性平衡方程(NBE)对高分辨率模式数据进行诊断分析,较详细地说明了非平衡流的出现而引起的地转适应过程以及地形强迫对重力波产生和发展的作用,和它们对强降雪过程的影响。
2.
Numerical experiments show that the neutral typhoon track, typhoon rainfall distribution and intensity are obviously affected by the interactions of the factors including outer—region circulation,ambient subtropical high system, subsynoptic scale jet steam and topographic forcing.
数值试验表明,台风外围环流、环境场副热带高压系统及其边缘次天气尺度强风带与地形强迫因素的相互作用对于变性台风移动路径、台风暴雨落区分布及其降水强度有显著的影响。
3.
The nonlinear balance equation (NBE) is evaluated for its usefulness in the diagnostic of the flow imbalance, and analyses indicates that the important role of the geostrophic adjustment and topographic forcing in gravity-wave even.
通过非线性平衡方程(NBE)对高分辨率模式数据进行诊断分析,较详细的说明了上游非平衡流的出现引起的地转适应过程对重力波产生和发展的作用,以及波动对下游强降雪过程的影响;通过一系列的敏感性实验,进一步说明了在这次过程中海陆热力差异,地形强迫对降雪过程产生的影响。
4)  compulsive strain
强迫应变
1.
The creep strain is then treated as the compulsive strain and the finite element method for creep analysis of the segmental construction concrete bridges is derived.
根据积分中值定理,利用时间段中点时间徐变系数推导了有效弹性模量计算公式,以替代传统的老化系数方法;并视徐变应变为强迫应变,推导了节段施工桥梁徐变分析的有限元方法。
5)  forced instantaneous variables
强迫跃变
6)  enclosed weiding
强迫成形焊
补充资料:大坝内部变形观测(见水工建筑物变形观测)


大坝内部变形观测(见水工建筑物变形观测)


  daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条