1) River hanging
悬河化
2) suspended river
悬河
1.
Reliminary analysis of origin of suspended river of hydropower project in Pakistan;
巴基斯坦高摩赞大坝枢纽悬河的成因初探
2.
Types of suspended rivers and their formation concitions;
试论悬河补给——悬河的类型及其成因
3.
The paper proves the following factors that effect the stability of suspended river of the Yellow River from geologicalpoint of view: a) control mechanism of geological structure; b) river geomorphology; c) structure of bed load and earthmass and; d) geological function of river dynamics.
从地学角度出发,论证了影响黄河悬河稳定性的因素:①地质构造控制机制;②河流地貌;③河床质与土体结构;④河流动力地质作用。
3) Hanging river
悬河
1.
Showing hanging river spectacle,containing historical cunures and building characteristic brand——Tentative plans of tourism exploitation of Yellow River in Kaifeng City;
悬河奇观·历史文化·特色品牌——黄河开封段旅游开发设想
4) Aboveground River
悬河
1.
The aboveground river of the Yellow River was formed by natural and artificial processes.
黄河悬河的形成是自然营力与人为因素综合作用的产物。
5) suspended river of the Yellow River
黄河悬河
6) Aboveground segment of Yellow River
黄河悬河段
补充资料:公理化方法(见公理化和形式化)
公理化方法(见公理化和形式化)
axiomatical method
gongllbuafangfa公理化方法化和形式化。(axiomatieal method)见公理
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条