说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 时序级联相关系统
1)  sequential cycle cascade correlation system
时序级联相关系统
2)  Cascade-correlation
级联相关
3)  chronicle correlation
时序关联
1.
According to some problems existed in network intrusion detection technique,such as alerts overwhelming,false-positives and lack of alert description,this paper introduces chronicle correlation method to alert events analysis by some correlative examples.
针对当前网络入侵检测技术存在的报警信息量太大、误报警多以及缺乏报警语义描述等问题,结合相应事例,采用时序关联方法对网络入侵行为的报警信息进行分析。
4)  interconnected systems with time delays
时滞关联系统
5)  interconnected time-delay system
关联时滞系统
1.
The robust decentralized stabilization based on observer was discussed on a class of uncertain interconnected time-delay systems of which the time-varying parameter uncertainties are unknown and norm-bounded.
讨论了一类不确定关联时滞系统基于状态观测器的鲁棒分散镇定问题·系统的不确定性是未知时变且范数有界的,系统状态及控制输入、互联项中均存在时滞·根据李亚普诺夫稳定性理论,给出了系统可分散输出反馈镇定的充分条件,即一组线性矩阵不等式(LMI)有解·所设计的分散控制器保证系统渐进稳定·仿真结果表明,该方法是有效的
6)  time-varying delays interconnected system
变时滞关联系统
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
  成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。

  非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条