说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 相关任务调度
1)  dependent tasks schedule
相关任务调度
2)  dependent task scheduling algorithm
相依性任务调度
3)  task related
任务相关
1.
Objective To explore the processing mechanism of human brain for task related and stimulus related conflicts.
目的 探讨大脑对刺激相关和任务相关冲突的处理机制。
4)  dependent tasks
相关任务
5)  task scheduling
任务调度
1.
Application of priority-based task scheduling in the data exchange platform;
基于优先级的任务调度模型在数据交换平台中的应用
2.
Battery-aware task scheduling algorithm on DVS enabled processors;
针对变电压处理器的电池感知任务调度算法
3.
Parallel task scheduling strategy with multi-objective constraints in P2P;
对等网络环境下多目标约束的并行任务调度策略研究
6)  tasks scheduling
任务调度
1.
Design and implementation of observation satellites tasks scheduling system;
多观测卫星任务调度系统的设计与实现
2.
Grid tasks scheduling strategy based on degree of multi-objective conflict
基于多目标冲突度网格任务调度策略
3.
A proper algorithm for tasks scheduling based on features of parallel system on multi-core processor is proposed.
针对多核处理器并行系统的特点,提出了相应的任务调度算法,该算法在任务调度之前加入了任务分配技术,通过合理的任务分配,可有效减少多个处理器间的通信开销,使任务调度效率更佳。
补充资料:相关成本与非相关成本(relevantcostandirrelevantcost)
  成本按其发生是否与决策项目相关的分类。相关成本是指与制定决策方案有关的联影响的成本,例如当期是否接受一批订货,生产该批订货需要花费的各种成本,即为相关成本。如该批订货是一种特殊订货,即其价格低于以前生产这种产品的完全成本时,其相关成本就是生产该批产品的变动成本。如果生产该批订货需扩大生产能力时,相关成本就既包括生产的变动成本,还包括添置设备等所需的其他成本。机会成本、差量成本、现金支出成本、可避免成本等均属相关成本。

  非相关成本是指与制定决策方案并无影响的成本,因而在决策时可不予考虑。命名如接受特殊订货时,原有固定成本就属于非相关成本,因为即使不接受这批特殊订货,这些固定成本也会照样发生,当有几种方案可供选择时,各种方案都需发生的成本就是非相关成本,如采用不同的生产工艺组织生产时,构成产品实体的原材料在各种生产工艺过程中都要发生,所以这些原材料成本便是非相关成本。不可避免成本、沉落成本等属于不相关成本。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条