说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 利水明目
1)  Disinhibiting water to brighten the eyes
利水明目
2)  blood-quickening water-disinhibiting eyes-brightening method
活血通脉利水明目法
1.
Objectives:To explore blood-quickening water-disinhibiting eyes-brightening method\'s therapeutic effects on the non ischemic retinal vein occlusion.
目的:考察活血通脉利水明目法(散血明目片)治疗非缺血型视网膜静脉阻塞的临床疗效。
3)  Promoting blood circulation and improving urine for vision
活血通脉利水明目
4)  water project
水利项目
1.
Environmental evaluation issue of water project;
水利项目的环境评价问题
2.
Audit of ecosystem is an effective way of scientifically evaluating ecological, social and economic benefits of water project and necessity of solving water problems in China as well as alternation of water management concept.
水利生态绩效审计是科学地评价水利项目生态效益、社会效益和经济效益的有效手段,是我国资源环境问题凸显和治水思路转变的必然要求。
5)  water conservancy project
水利项目
1.
Study on TOT Applied in Semi-commonweal Water Conservancy Project;
TOT在准公益性水利项目中的应用研究
2.
This paper Talks about the features of water conservancy projects and some factors in economic evaluation that should be taken into consideration, and puts forward some problems needing attention in the evaluation.
论述了水利项目的特点及其经济评价中应考虑的因素,提出了评价时应注意的一些问题。
3.
Through studying and using the experiences of project follow-up evaluation in China for reference,the status quo of follow-up evaluation research of water conservancy projects in China is elaborated,and the theories and methods of follow-up evaluation of water conservancy projects are discussed preliminarily.
本文在学习和借鉴国内有关项目后评价的基础上,阐述了我国水利项目后评价的研究现状,并对水利项目后评价的理论和方法进行了初步探讨,总结我国水利建设项目后评价的发展现状,分析我国目前水利建设项目后评价存在的问题,指出评价内容和侧重点随项目的特点而有所不同;注重全过程的评价;评价方法越来越科学;后评价机制逐渐完善等水利建设项目后评价的发展趋势。
6)  water resources project
水利项目
1.
Real option approach to establish the model of the investment decision of water resources projects;
实物期权在水利项目投资决策中的模型构建
补充资料:地下水水资源评价(见水资源评价)


地下水水资源评价(见水资源评价)


  d ixiashui shuiziyuan Ping】ia地下水水资源评价见水资源评价。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条