1) delay recharge
延迟补给
1.
In this paper, the system analysis method is adopted to solve the time interval of precipitation delay recharge and the equation of the delay recharge weight coefficient.
该文采用系统分析方法求得了降雨延迟补给时段和延迟补给权系数方程。
2) delay recharge weight coefficient
延迟补给权系数
1.
In this paper, the system analysis method is adopted to solve the time interval of precipitation delay recharge and the equation of the delay recharge weight coefficient.
该文采用系统分析方法求得了降雨延迟补给时段和延迟补给权系数方程。
3) delayed administration
延迟给药
1.
Clinical analysis of delayed administration of glucocorticoid in the treatment of acute exacerbations of chronic obstructive pulmonary disease
糖皮质激素延迟给药治疗AECOPD的疗效分析
4) Delay/Compensation
延迟补偿
1.
The Problem of Delay/Compensation in Synthetic Aperture Radar Altimeter;
合成孔径高度计中的延迟补偿问题
5) compensating delay
补偿延迟
6) group delay spectra
群延迟补偿
补充资料:“chunji”级补给舰
主尺寸:舰长130米、舰宽17.8米、吃水6.5米
排水量:9000吨(满载)
动 力:2台16pa6 v 280 柴油机 12800马力
航 速:20节
装 载:4200吨燃料和水、450吨其它物品
武器装备:二座双管40毫米(或30毫米)和二座20毫米火炮
“chunji”(中文译名?)级补给舰首舰1990年服役,该级补给舰有三艘,舷号57、58、59
说明:补充资料仅用于学习参考,请勿用于其它任何用途。