1) full water and at-mospheric pressure test
满水和闭气试验
2) full water test
满水试验
1.
Aiming at the closed water test and full water test of urban drainage project, the appearance detection, water percolating capacity definition, construction condition detection of the project combined with detection application were introduced in this paper.
针对市政排水工程的闭水与满水试验,结合检测应用,介绍了在工程实际中的外观检查、渗水量测定、工况检查。
2.
In case of super-large circular water tanks, relevant measures are taken in construction to ensure the comprehensive effect of rigid and structural water proof new materials, using full water tests to check the results.
针对超大型圆形水池和防水砼特点,采取相应的施工措施,确保刚性防水、构造防水及新型防水材料的综合应用效果,并通过满水试验加以检验,从而总结防水结构施工经验,肯定和进一步推广自防渗砼和新型防水材
3) close gas test
闭气试验
4) closed water test
闭水试验
5) no-load saturation test
无载饱满和试验
6) simulated airtight test
闭气模拟试验
补充资料:石油产品沉渣和水试验
分子式:
CAS号:
性质:测定原油和燃料油中固体沉积物和水分的试验方法。将试样用等量的工业甲苯稀释并加热到(49±1)℃,装有刻度的离心管中,在离心机上以1300~1600r/min的速度旋转,观测离心管中分离出沉渣和水的体积量,以所占试样的百分数表示。
CAS号:
性质:测定原油和燃料油中固体沉积物和水分的试验方法。将试样用等量的工业甲苯稀释并加热到(49±1)℃,装有刻度的离心管中,在离心机上以1300~1600r/min的速度旋转,观测离心管中分离出沉渣和水的体积量,以所占试样的百分数表示。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条