1) dynamic contact condition
动接触条件
2) contact condition
接触条件
1.
A model of simulating the interaction between the reinforcement and concrete based on contact condition has been established in this paper.
建立了一种按接触条件模拟钢筋与混凝土之间相互作用的模型。
2.
In pipe laying and lifting analysis, the contact condition between pipeline and seabed, including deflection, rotation angle and bending moment, is sometime tricky in a normal mechanical model.
海底管道的铺设分析和提升分析都用到管道和海床之间的接触条件,这个同时含有挠度、转角和弯矩的接触条件,在一般的力学模型中是很难理解的。
3) contact boundary condition
接触边界条件
1.
One of the most difficult problems is how to deal with the contact boundary condition when simulating metal forming processes.
用有限元法模拟金属塑性成型过程的难点之一是接触边界条件的处理 ,本文着重介绍了处理金属塑性成型过程中接触问题的一般方法 ,包括接触边界的搜索、接触力的计算及接触热传导的计算三方面内容。
4) Interlayer Touch
层间接触条件
1.
Stress Response Analysis of Asphalt Pavement with Different Interlayer Touch Types under Actual Tire Pressure through 3D Finite Element method;
实测轮胎荷载作用下层间接触条件对沥青路面力学响应的三维有限元分析
5) load contact condition
载荷接触条件
6) ground contact condition
地面接触条件
补充资料:因水火风动故地动
【因水火风动故地动】
经云:此阎浮提地,南北阔二万一千由旬,东西阔七千由旬,厚六万八千由旬。地下有水,厚八万四千由旬。水下有火,厚八万四千由旬。火下有风,厚六万八千由旬。风下有金刚轮,过去诸佛舍利,咸在其中。或有时大风忽动,火亦随动。火既动已,水复随动。水既动已,地即随动。故云因水火风动故地动。(梵语阎浮提,华言胜金洲。梵语由旬,华言限量,或四十里,或六十、八十里也。)
经云:此阎浮提地,南北阔二万一千由旬,东西阔七千由旬,厚六万八千由旬。地下有水,厚八万四千由旬。水下有火,厚八万四千由旬。火下有风,厚六万八千由旬。风下有金刚轮,过去诸佛舍利,咸在其中。或有时大风忽动,火亦随动。火既动已,水复随动。水既动已,地即随动。故云因水火风动故地动。(梵语阎浮提,华言胜金洲。梵语由旬,华言限量,或四十里,或六十、八十里也。)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条