1) time-driven activity-based costing
时间驱动作业成本法
1.
This paper mainly introduces the establishing history of the time-driven activity-based costing,and through the comparison with the traditional activity-based costing,sums up the distinctions between the two methods,and puts forward some improvements of the time-driven activity-based costing.
主要介绍了时间驱动作业成本法的创建历程,并通过与传统作业成本法的比较,归纳出两种方法的区别,提出了时间驱动作业成本法的改进之处。
2) Time-Driven Standard Activity-Based Costing (T-SABC)
时间驱动标准作业成本法(T-SABC)
3) Time-Driven Activity-Based Costing (T-ABC)
时间驱动作业成本法(T-ABC)
4) time-driven Method
时间驱动法
1.
A decay model of residual chlorine in the water distribution network was established using the Lagrangian time-driven method.
建立了基于拉格朗日时间驱动法的供水管网余氯衰减微观模型,使用具有科学计算和绘图功能的Matlab软件和Access数据库建立了供水管网余氯衰减动态模拟系统。
5) Activity-Based Costing
作业成本法
1.
On the Application of Activity-Based Costing in our Country from the Case of Luo Yang Copper Group Company;
从洛铜集团看作业成本法在我国的应用
2.
Basic conceptions of Activity-based Costing and prospective of its application in health services;
作业成本法的基本原理及其在医疗服务成本测算中的应用前景
3.
Research on activity-based costing of operation cost account in high speed railway;
高速铁路运营成本的作业成本法测算研究
6) ABC
[英][,eɪ bi: 'si:] [美]['e 'bi 'si]
作业成本法
1.
The Feasibility of Activity-based Cost (ABC) in Our Country's Open-pit Mine Enterprise;
作业成本法在我国露天矿山企业应用的可行性
2.
Research and application of the ABC in Manufacturing Execution System;
作业成本法在制造执行系统中的研究与应用
3.
ABC and Resource Cost Model: Theoretical and Case Study;
作业成本法下的资源成本模型:理论与案例研究
补充资料:作业成本计算法
作业成本计算法是将间接成本和辅助资源更准确地分配到作业、生产过程、产品、服务及顾客中的一种成本计算方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条