说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 优先关系矩阵
1)  precedence relation matrix
优先关系矩阵
2)  fuzzy preferential relation matrix
模糊优先关系矩阵
1.
In order to make consistency and to eliminate dimensions of system evaluation indexes, and to avoid determining membership function in fuzzy comprhensive evaluation, a new approach is studied with which preference values of fuzzy preferential relation matrix A can be used as consistency and non-dimension evaluation indexes.
为处理系统评价中各评价指标的一致无量纲化问题,避开模糊综合评价方法中建立隶属度函数的困难,探讨了用模糊优先关系矩阵A的优度值作为各评价指标的一致化和无量纲化值的新途径。
3)  precedence matrix
优先矩阵
4)  precedence relation
优先关系
1.
The blurry accordant matrix keeps away from the characteristic factor matrix while use precedence relation coefficients to describe the project,which can keep away from subjection confirming in the decision-making when there have many qualitative and quantitative factors.
模糊一致矩阵法则避开了特征因子矩阵的建立,利用优先关系系数来描述方案间的优劣,在大量定性因素与定量因素并存的决策中成功地避开了隶属度确定。
2.
The aggregative rank index and the aggregative precedence relation between the alternatives are pro.
定义了方案的集团序指标和方案的集团优先关系。
3.
The aggregative rank index and the aggregative precedence relation between the alternatives are proposed.
首先,定义了方案集的集团序,定义了方案的集团序指标和方案的集团优先关系。
5)  prior relation method
优先关系
1.
Based on the fuzzy prior relation method,the article sets up a fuzzy optimum decision mathematical model of bid and appraised bid.
运用模糊优先关系比较法建立了工程建设项目的招标评标方法 ,与层次分析法相比较 ,这种方法不仅具有科学性和合理性 ,而且方法简捷使用方便 ,保证了评标的客观性与公正
2.
This paper gives a new method,using both Value Engineering(VE) method and fuzzy prior relation method.
利用模糊优先关系比较法并借鉴价值工程的思想,从功能和成本2个方面,对影响评标的多个因素进行综合评价,给出招标评标的综合评价方法。
6)  priority [英][praɪ'ɔrəti]  [美][praɪ'ɔrətɪ]
优先关系
1.
The fuzzy priority comparison method can be used to quantify and sequence these complex factors to find out key factors affecting investment expansion so as to adopt necessory measures to control them.
分析了能使住宅建设项目投资膨胀的诸多因素,运用模糊优先关系比较法的数学方法,请专家将这些复杂因素的重要性进行量化并给以排序,找出重点影响投资膨胀的因素,便以采取措施加以重点控制。
2.
In this paper, the concept of dynamic priority systems is developed based on bounded P/T systems and the interleaving and the true concurrency semantics are provided for them respectively.
优先关系是并发系统控制的重要手段 ,常用于解决并发系统设计中的冲突问题 。
补充资料:优先承租权与优先购买权
优先承租权与优先购买权:出租人在根据城市规划和建设需要改建、翻建出租的房屋时,承租人应当予以协助(如按时搬迁),出租人将改建、翻建后的房屋出租时,原承租人有优先承租的权利。出租人在出卖已出租的房屋时,承租人有优先购买权,得按照规定的条件购买现住房。《民法》魏振瀛,第一版,第481页,北京大学出版社
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条