1) Alternate Construction
搭接施工
1.
A Study on Time Optimization of Alternate Construction Network;
搭接施工网络工期优化研究
2) technique for joint construction
搭接处施工技术
3) multi-dependency construction schedule plan
搭接施工计划
1.
In order to prepare and optimize multi-dependency construction schedule plan,it is very important to calculate the earliest start times,latest start times,earliest finish times,latest finish times,total floats,free floats and calculated project duration.
为了编制和优化搭接施工计划,计算工作最早开始时间、最迟开始时间、最早完成时间、最迟完成时间、总时差、自由时差和计算工期十分重要。
4) framing construction
搭设施工
1.
Steps such as framing design computation,check analysis of bearing capacity,framing construction and ways of construction control,in the construction of the heavy portal full framing falsework are introduced.
通过对一高速公路特大桥工程连续箱梁现浇施工,介绍了重型门式满堂模板支架构架设计计算与承载能力验算、支架搭设施工工艺及施工过程控制的一种适用方法。
5) overlapping process
搭接工艺
1.
Study on overlapping process in laser transformation hardening of stamping die;
冲压模具激光表面强化的搭接工艺研究
6) Overlap processing technology
搭接法工艺
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。