1) Heat flow site
热流测点
3) thermodynamic measuring points
热工测点
1.
Layout of thermodynamic measuring points and instrument selection for 116 MW CFB hot water boiler;
116MW循环流化床热水锅炉热工测点布置及仪表选型
4) Hot spots detection
热点检测
1.
Power boiler air preheater hot spots detection system is a indispensable installation which are applied in power plant largely.
因此对空气预热器的热点检测是不可缺少的。
5) hot point inspection
热点探测
1.
that is to installation of hot point inspection system in order to detect the first firing point.
针对回转式空气预热器的安全隐患,提出了探测第一失火点的装置—热点探测系统。
6) stagnation heat flux
驻点热流
1.
For an axial symmetric configuration with the nose radius of 5 cm,its stagnation heat flux along an ultra-low trajectory arrives at a maximum value of 50 MW/m~2 around altitude 25 km,which is about half of the maximum stagnation heat flux along a minimum energy trajectory.
头部半径为5cm的轴对称外形,沿超低弹道飞行时,其驻点热流在高度26 km左右达到最大值50 MW/m~2,约为最小能量弹道驻点热流最大值的50%。
补充资料:闭式单点、双点压力机
| |||||||
主要参数内容 | 国际先进 | 国内先进 | 国内一般 | 国内落后 | 评定方法及说明 | ||
(一)加工精度 | 参照GB10924-89、GB10933-89、JB5200-91 | ||||||
1、滑块下平面对工作台上平面的平行度(mm) | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.02+0.10/100×滑块下平面的被测长度 | |||||||
2、滑块行程对工作台上平面的垂直度 | 30%精度储备 | 20%精度储备 | 达到规定值 | 大于规定值 | |||
0.05+0.02/100×滑块行程长度 | |||||||
(二)结构性能 | |||||||
1、离合器、制动器接通率,当滑块行程次数≤16次/分时为70%,≤25次/分时为60%,≤45次/分时为50% | 大于规定值10% | 大于规定值 | 达到规定值 | 达不到规定值 | |||
2、液压超负荷保险装置、微调装置、吨位指示器 | 全部具有 | 全部具有 | 部分具有 | 没有 | |||
(三)噪声dB(A) | |||||||
1、公称力≤400kN | ≤85 | ≤87 | ≤88 | >88 | |||
2、公称力>400kN | ≤87 | ≤88 | ≤90 | >90 |