1) non-delay transformation approach
无滞后转换法
1.
We transform the two-point boundary value problem with time-delay terms and time-advance terms to a group of problems without time-delay terms and time-advance terms according to the concept of non-delay transformation approach.
根据无滞后转换法的思想 ,先引入状态向量的增量 ,将其视为附加扰动输入 ,再利用微分方程的逐次逼近法 ,将既含有时滞项又含有超前项的两点边值问题化为既不含时滞项又不含超前项的两点边值问题族。
2) scale-independent hysteretic-switching
度量无关的滞后切换
3) hysteresis switching
滞后切换
1.
In this paper, the hysteresis switching in adaptive control is applied into the coal-fired power plant boiler drum level, and a practical method of hysteresis switching in adaptive control is presented by the combination of theory and engineering.
本文将滞后切换参数自适应控制策略应用于电站锅炉汽包水位控制,理论研究与工程调试相结合,给出了一种符合工程实际的滞后切换自适应控制方案。
4) switching lag
切换滞后
5) shift hysteresis
换档滞后
补充资料:滞后演算法
滞后演算法
lag-and-route method
zhihou yansuanfa滞后演算法(lag一and一route method)利用天然河道洪水波自上游向下游传播中推移和坦化两种作用的姆念,求得汇流曲些来进行河道洪水演算的方法。该法的基本概念认为,推移作用表示水流流经一联串“线性渠道”,其入流过程往下推移而不改变其形状,故它反映洪水波的滞后现象。坦化作用表示入流过程流经一联串“线性水库”而展平,故它反映洪水波的坦化。一个“线性渠道”和一个“线性水库”串联为一个子河段,那么瞬时单位入流量流经一个子河段形成的汇流曲线(即迟滞瞬时单位线)。公式为:。(t)一佘一孚一枷〔一气月’式中U(t)为汇流曲线t时刻的纵标;r为推移参数,其初值可选取入流、出流起涨传播时间;K为坦化参数,是入流推移r后,其蓄量与出流关系线的斜率。 中国在20世纪70年代从生产实践中应用于多河段发展成”、r、K三参数的迟滞瞬时单位线法,其公式为:U又t)=0,(0共t(”r)U(t)=六了1(n)/t一嘟、_,「t一nrll一-二丁一j“一‘己矽l一下万一~I,\八/L八J (nr
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条