说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 递归膨胀
1)  recursive dilation
递归膨胀
2)  Zero-inflated Poisson
零膨胀Poisson回归
3)  tertm(thermal-expansion resin transfer molding)
热膨胀树脂传递模塑
4)  ZIP regression model
零膨胀Poisson回归模型
1.
If we regard the forest fire data as the grouped factor data and ordinal state variable data respectively,then we can model the forest fire data by the Logistic and ZIP regression models.
该研究表明所建立的Lo-gistic回归模型和零膨胀Poisson回归模型都是分析火灾与影响因素相关性的适用模型。
5)  Expansion [英][ɪk'spænʃn]  [美][ɪk'spænʃən]
膨胀
1.
Physical and Chemical Changes of Tobacco Stem and Stem Granules During Microwave Expansion;
微波膨胀过程中烟梗及由其制备的颗粒的物理化学变化
2.
An experimental study on the expansion mechanism of alkali-silica reaction in concrete;
混凝土中碱-硅反应的膨胀机理研究
3.
Control and Support Technology of Expansion Soft Rock;
离散膨胀性软岩控制及支护技术
6)  expand [英][ɪk'spænd]  [美][ɪk'spænd]
膨胀
1.
Application and technology of expandable liner hanger;
可膨胀尾管悬挂器技术及其应用
2.
The simulation of casing expandable reinforce;
套管膨胀加固模拟仿真分析
3.
Study of lysine and protein level in expand porket feed;
膨胀乳仔猪日粮中赖氨酸和蛋白质水平研究
补充资料:可递延成本与不可递延成本(deferrablecostandundeferrablecost)
  可递延成本是指在企业财务负担能力有限的情况下,对已决定选用的某一方案推迟执行,或将方案中的某一些费用延迟到以后期内再发生等等,这种与推迟方案有关或与延迟支出有关的费用,称为可递延成本,有时也称之为可延缓成本。

  不可递延成本是指已选定的某一项方案,或某些执行方案中的某些支出,即使在企业财务负担能力有限的情况下,也不能推迟执行,否则便会对整个经营或投资过程产生重大不利影响。这种与已选定方案有关的,或与方案中某些支出有关的费用,称灾为不可递延成本,也可称之为不可延缓成本。

  之所以将成本分为可递延和不可递延,是要求我们在决策过程中,充分注意各项决策相关成本。在企业财务负担能力有限的情况下,应分别轻重缓急,依次排队,量力而行。只有这样,才能更有效地运用现有的资金,提高资金的利用率,最大限度地提高企业经营效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条