说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> Dicls-A1cder递反应
1)  Retro-Diels-Aleder reaction
Dicls-A1cder递反应
2)  Biginelli-type condensation
imino Dicls-Alder反应
3)  reactive-transport
反应–传递
1.
The present study evaluates a reactive-transport model of buffer cementation using published experimental results on the hydrothermal alteration of clay buffers embedded in crystalline rocks.
据此,使用已发表的有关结晶岩石中缓冲黏土的水–热转换的试验结果,研究并评估一种缓冲胶结的反应–传递模型。
4)  decrement response
递减反应
5)  hydrogen transfer reaction
氢传递反应
6)  chemical transport reaction
化学传递反应
1.
Simulation of carbon deposition conditions in a methane or acetylene flame based on mechanisms of chemical transport reaction;
基于化学传递反应模拟甲烷和乙炔燃焰中碳沉积的条件
2.
The effects of adding fluorine, chlorine, phosphorus and oxygen in C - H systems and the effects of adding oxygen, fluorine in C - S systems on the chemical transport reaction in the production of carbon nanotube (CNT) via chemical vapor deposition(CVD) have been calculated by using software developed by scientists at Russian Academy of Science.
利用俄罗斯科学院研制的软件计算分析了CVD法制备碳纳米管过程中在碳氢体系添加氟、氯、磷、氧等元素及在碳硫体系中加入氧、氟等元素对于化学传递反应的影响,结果表明,这些元素的加入有利于传递反应的进行。
补充资料:可递延成本与不可递延成本(deferrablecostandundeferrablecost)
  可递延成本是指在企业财务负担能力有限的情况下,对已决定选用的某一方案推迟执行,或将方案中的某一些费用延迟到以后期内再发生等等,这种与推迟方案有关或与延迟支出有关的费用,称为可递延成本,有时也称之为可延缓成本。

  不可递延成本是指已选定的某一项方案,或某些执行方案中的某些支出,即使在企业财务负担能力有限的情况下,也不能推迟执行,否则便会对整个经营或投资过程产生重大不利影响。这种与已选定方案有关的,或与方案中某些支出有关的费用,称灾为不可递延成本,也可称之为不可延缓成本。

  之所以将成本分为可递延和不可递延,是要求我们在决策过程中,充分注意各项决策相关成本。在企业财务负担能力有限的情况下,应分别轻重缓急,依次排队,量力而行。只有这样,才能更有效地运用现有的资金,提高资金的利用率,最大限度地提高企业经营效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条