1) formation and collapse of collision plateaus
碰撞高原的形成和坍塌
2) crash forming
碰撞成形
3) in-site collapse
原地坍塌
1.
In view of Wulihe Stadium in Shenyang city its structure and around environment,especially it is the most largest of national buildings to be demolished so far,so millisecond in-site collapse blasting is adopted,and technology design consists of blasting pretreatment,blasting network choice and blasting safety test.
针对沈阳市五里河体育场其自身结构及周边环境,尤其是迄今为止国内一次爆破拆除面积最大的建筑物等特点,采用毫秒微差、原地坍塌爆破法进行爆破拆除,其技术设计包括爆破预处理、爆破网络选择、爆破安全校核。
5) vertical collapsing
原地坍塌
1.
Considering the surrounding, location relationship and structure, the directional and vertical collapsing blasting was used to demolish three buildings.
根据爆区周围环境、建筑物相互关系和结构特点,采取定向爆破和原地坍塌爆破对建筑物群进行同时爆破拆除。
6) collision-deformed
碰撞变形的
补充资料:春季黄河河套河段形成的冰坝和冰桥
春季黄河河套河段形成的冰坝和冰桥
甏雾i网j弋瓣‘k謦P佣’弼i厂1’_;●‘..≮t二-黟}翻■
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条