说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 多层热结构
1)  Multilayer thermal texture
多层热结构
2)  multi layer insulation structural
多层绝热结构
3)  multilayer insulation(MLI)
多层隔热结构
1.
In order to improve the performance of traditional temperature-resistant insulation materials,a newtype high-temperature multilayer insulation(MLI) material was developed by felting process using alumina silicate fiberpapers and silica fiber net as substrate,and hydrophobic silica aerogel granules as fillings.
为了改善传统应用的多层隔热材料的耐温及隔热效果等性能,以耐高温硅酸铝纤维纸和石英纤维网为基体材料,疏水性SiO2气凝胶颗粒为隔热填料,采用粘结工艺制备了新型耐高温多层隔热结构。
4)  multilayered structure
多层结构
1.
Love wave propagation in magneto-electro-elastic multilayered structures;
Love波在电磁弹性多层结构中的频散特性
2.
The ultrastructure of the blepharoplast and the multilayered structure (MLS) in the fern Osmunda cinnamomea var.
asiatica Fernald)精子发育过程中的生毛体和多层结构的超微结构进行了研究。
3.
The reflection and transmission of elastic wave in a multilayered structure composed of elastic base covered with magneto-electro-elastic materials were fully investigated.
研究了弹性基底上覆盖电磁弹性材料组成的多层结构中弹性波的反射与透射系数问题。
5)  multilayer structure
多层结构
1.
The paper puts forward the function gradient model of coolking woven fabric and designs the corresponding multilayer structure.
文章提出了Coolking机织吸湿快干面料功能梯度模型,设计相应的机织多层结构。
2.
Chinese sedimentary basins can be grouped into three types: 1 ) simple halfgraben-like basin, 2)dual-layer superposed basin of half graben-like basin and de pression, 3) multilayer structure basin having platform, half graben-like basin anddepression which are superposed vertically.
中国沉积盆地可分为单层结构箕状断陷型,双层结构断(陷)拗(陷)型,多层结构(地)台、断(陷)、拗(陷)型。
3.
The results indicate that multilayer structure d.
采用普通陶瓷工艺,制备了Co2Z(Ba3Co2Fe24O41)六方铁氧体及Ba2+被Sr2+部分取代的Z型六方铁氧体[Ba3(1-x)Sr3xCo2Fe24O41],并将烧结好的铁氧体粉料压制成多层结构样品。
6)  multi-layer structure
多层结构
1.
Study of relay protection device setting coordination software based on multi-layer structure and component technology;
基于多层结构和组件技术的保护装置整定计算系统研究
2.
Taking the lightning protection information system as the example,the paper introduces the technical method for designing a distributed multi-layer structure of lightning management information system with Delphi MIDAS.
以防雷检测信息系统为例,介绍了用Delphi的MIDAS设计分布式多层结构的防雷管理信息系统的技术方法。
3.
A kind of multi-layer structure blue organic light-emitting diode(OLED) has been developed with TPBi as emitting host material by using vacuum deposition.
采用真空热蒸镀技术,以TPBi为蓝光主体材料制备了一类多层结构的蓝色有机发光二极管(OLED),其结构为:ITO/CuPc(30 nm)/NPB(40 nm)/TPBi(30 nm)∶GDI691(x%)/Alq3(20 nm)/LiF(1 nm)/Al(50 nm),其中x%为发光层掺杂浓度,实验中分别取1%,2%,3%和4%。
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条