1) constructed item
已建项目
1.
For the jeopardy assessment on geological calamity in the lands of constructed item, the process that carries through in tracing back to the addressing stage is familiar to adopt.
目前,对已建项目建设用地的地质灾害危险性评估,通常采用的方法是追溯到选址阶段来进行。
2) adopted project
已通过项目
3) construction project
建设项目
1.
The analytical model of safety cost rate for the construction project;
建设项目安全成本率分析模型
2.
Discussion on safety evaluation of power plant construction project;
火力发电建设项目安全评价问题探讨
4) project construction
项目建设
1.
Contribution of science and technology extension in project construction and management;
科研推广在项目建设与管理中的作用
2.
On control of project cost in project construction process;
项目建设过程中工程造价的控制
3.
LCC management in paper machine project construction;
纸机项目建设中的LCC管理
5) construction projects
建设项目
1.
Reliability past-evaluation to expressway construction projects;
高速公路建设项目可靠性后评估
2.
Research on Socioeconomic Environmental Impact Assessment of railway construction projects;
铁路建设项目社会经济环境影响评价研究进展
6) Construction item
建设项目
1.
The emphases and analyzing method of construction item supervision;
建设项目管理的重点及分析方法
2.
Cost control of construction item
建设项目的工程造价控制
3.
The engineering cost of construction items penetrates the whole process of a project.
建设项目工程造价的控制贯穿于项目的全过程,不同的建设阶段对项目造价的影响不同,控制方法亦有所不同,本文就如何搞好建设项目不同阶段工程造价的控制做了一些探讨。
补充资料:什么是拟建项目的总图
拟建项目确定建设地址之后,总图设计不仅十分必要,而且十分重要。总图设计不仅要建设单位生产工艺流程、生活等方的基本要求,还必须坚持合理开发地下空间和充分利用各种设施的基本原则,符合城市规划要求以及城市规划管理部门和其他管理部门(如环保、消防、防疫、防震、防滑坡、交通、文物保护等)的有关规定,这是一项理论联系实际的科学规划设计成果。一般来讲,它应当经过多方案的比较论证后择优选定。总图设计经审查批准后,则作为确定用范围和面积的科学依据核发建设用地规划许可证的依据,以及开展下阶段工程设计的基础。
总图应包含的内容很多,对于城市规划管理审批而言,它起码应反映以下个方面:
(1)经济合理的建设项目拟用地大小和范围;
(2)标明城市规划管理部门给定的道路畿线和其他的外部限制条件,如山、水和已经建设使用的用地及其建筑物等;
(3)标明拟建建筑物、构筑物的位置、形状、层数、室内外标高,室外道路向、标高、坡度、转弯半径,以及环境、绿化布置和必要的管网布置等。
(4)说明总用地面织、各类建设用地面积及百分比、总建筑面积及各类建筑的分项建筑面积、建筑密度、建筑容积率技术经济指标。
(5)综合开发区还应当包括公共服务配套和市政基础配套设施具体布置。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条