1) lake-bottom deformation
湖底变形
3) Bulging up bottom board to be out of shape
底鼓变形
4) bottom deformation
井底变形
1.
Based on the existing problems of the silo liner failure and bottom deformation in the large vertical coal silo of the production mine,the paper systematically analyzed the coal silo failure status and mechanism.
基于生产矿井特大立式煤仓存在井壁破损、井底变形的现实问题,对煤仓破损的现状、机理进行了系统分析。
5) the bottom of lake
湖底
1.
In the practice of open-pit mining in the bottom of lake, low costs of building a dyke are created by self-supporting money.
湖底矿露天开采,自筹资金,创造筑坝低成本,克服特大风险,投资小,见效快,安全生产。
6) Evolution of Lakeshore shape
湖岸形态变化
补充资料:大坝内部变形观测(见水工建筑物变形观测)
大坝内部变形观测(见水工建筑物变形观测)
daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条