3) water inflow into tunnel
隧道涌水量
1.
The paper deals with basic thought and method of prediction of water inflow into tunnel by fuzzy clustering theory, and presents main factors infuencing water inflow and their quantized formulae.
论述了模糊聚类理论用于隧道涌水量预测的基本思路与方法 ,提出了影响隧道涌水量的主要因素及其量化公式 ,并以秦岭特长隧道 (Ⅱ线 )为对象 ,预测出其涌水量介于 1。
2.
Based on the analytic formula of groundwater inflow into tunnel,this paper puts forward a method to choose the minimal rock cover of sub-sea tunnel.
基于隧道涌水量解析公式,从隧道涌水量的角度出发考虑确定海底隧道的最小岩石覆盖厚度。
4) calculation of tunnel discharge
隧道涌水量计算
5) estimation of water-gushing amount
涌水量预测
1.
To emphasize expatiating on how the method of grey systems analysis works in the estimation of water-gushing amount of the tunnel,then compare the result with two common methods.
着重阐述了灰色系统分析方法在隧道涌水量预测中的应用,并采用两种较常用的隧道涌水量计算方法(地下径流模数法及降水入渗法)与之进行了比较,其结果对铁矿隧道及其他隧道的涌水量预测具有一定的参考意义。
6) Tunnel Gushing
隧道涌水
1.
Analysis and Curing Measure of Pi Shuang ao Tunnel Gushing;
砒霜坳隧道涌水原因分析及处理措施
2.
The paper analyses the fundamental and method for the study work on discharge rate in karst tunnel gushing from the prediction of the discharge rate,and expatiates the method on the basis of special geologic condition in karst region.
论述了隧道涌水预测的基本原理与方法,并重点结合岩溶地区特殊的地质条件对有关方法进行了阐述。
补充资料:发育进度预测法(见发生期预测)
发育进度预测法(见发生期预测)
发育进度预测法见发生期预测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条