This paper analyzes on the reasons why the accidents of the gas explosion occur in the tunnel,and puts forward some methods,measures and matters needing attention of the safe discharge of the gas.
分析了巷道内瓦斯灾害事故发生的原因,提出了安全排放瓦斯的方法、措施和有关注意事项。
4) floating and installation
沉放安装
1.
The key technique in large caisson construction of marine works is introducing precast concrete works off site,rolling method,floating and installation in this paper.
香港中环填海三期的直立波浪吸收型海堤和冷水泵房工程,采用场外预制、气囊搬运、浮运及沉放安装的沉箱施工技术。
5) position of sound production
位置安放
6) laying position
安放位置
1.
Analysis of laying position of new inner blowout preventer;
新型内防喷器安放位置分析
2.
The laying position and well blowout pressure are analyzed and discussed briefly and the relationship curve of drill bit pressure drop vs flowrate and fluid density i.
对其安放位置及井喷压力进行了简要分析和探讨,建立了钻头压降与流量、流体密度的关系曲线。