说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 裂纹尖端滑开位移
1)  crack tip sliding displacement
裂纹尖端滑开位移
2)  CTOD
裂纹尖端张开位移
1.
Experimeneal research on high Temperature CTOD of electron beam welded joints of GH4169 alloy;
电子束焊GH4169合金高温裂纹尖端张开位移试验
2.
Then regression equation is obtained between CTOD and welding parameter.
应用一次回归正交设计法,对X70管线钢环焊过程的焊接工艺参数进行设计,采用设计后的焊接工艺对X70管线管进行施焊,对环焊接头进行裂纹尖端张开位移试验,最后回归得到CTOD值与焊接工艺之间的回归数学模型。
3)  crack tip opening displacement
裂纹尖端张开位移
1.
0 for predicting the welding performance parameter-crack tip opening displacement (CTOD)-of high strength pipeline steel joint.
0建立了预测高强度管线钢焊接接头性能参数裂纹尖端张开位移(CTOD)的BP神经网络模型。
2.
Based on BS7448 fracture toughness test experiment standard (ISO/TC164/SC4-N400) and DNV-OS-C401, crack tip opening displacement (CTOD) tests are carried out on 80 mm thick plates butt joints of offshore petroleum platform joined by the submerged-arc welding and CO2 gas shielded welding.
依据英国标准BS7448断裂韧度试验标准(ISO/TC164/SC4-N400)和DNV-OS-C401,采用埋弧焊和CO2气体保护焊工艺对国产钢板板厚为80mm的海洋石油平台导管架对接接头试样进行了低温裂纹尖端张开位移(CTOD)试验。
3.
The measuring and testing technique of crack tip opening displacement (CTOD)tests for large welded joints in the offshore platform under low environmental temperatures of -15℃ were performed in accordance with the BS 7448 standard (part2,1997).
依据BS74 4 8断裂韧度试验标准 (ISO/TC16 4 /SC4 -N4 0 0 ) ,对采用埋弧焊 (SAW)工艺施焊的、板厚为 5 4mm的海洋石油平台大厚度对接接头试样进行了低温裂纹尖端张开位移 (CTOD)试验。
4)  crack tip opening displacement(CTOD)
裂纹尖端张开位移(CTOD)
5)  crack tip displacement
裂纹尖端位移
1.
Adopting the fracture parameters as crack tip displacement,crack propagation of U75V steel tread fatigue is analyzed in elastic-plastic case.
根据试验观察的裂纹尖端特征,建立了钝形疲劳裂纹模型,以裂纹尖端位移为断裂参量,分析了U75V钢弹塑性情况下踏面疲劳裂纹扩展特性。
6)  critical crack tip opening displacement δIc
临界裂纹尖端张开位移δIc
补充资料:裂纹尖端张开位移
分子式:
CAS号:

性质:在外载荷的作用下,裂纹尖端两表面间的张开位移。用符号δ表示。由于在弹塑性条件下,已得到δ与工作应力σ(或应变ε)以及裂纹尺寸a(裂纹的半长)之间的关系,因此它是弹塑性断裂力学中的一个重要参量。 

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条